Download presentation
Presentation is loading. Please wait.
Published byStuart Bridges Modified over 9 years ago
1
Bicycle path in Vsetín Tomáš Pařízek Radim Látal
2
Why bicycle path ? Vsetín miss some bicycle track safety of cyclists when riding a bike separation of cyclists from traffic attracting tourists to Vsetín responding to the request of citizens
3
Where bike path runs along the river Bečva and around the tennis courts leads over a bridge at the Industrial School leads under former railway bridge and then along the river Becva the total length of the cycle path is 2400 m
5
Start of the bicycle trail bike trail begins in the street Jiráskova, u lázní. it builds on bike trail that leads to Semetín
7
End of the bicycle trail end of bicycle path is on Ohrada u splavu there it connects to the bike path leads to the Velké Karlovice
9
Start of constructions provisional commencement date 1. 5. 2016 anticipated end 31.10. 2016
10
construction costs
11
Thank you for your attention.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.