Presentation is loading. Please wait.

Presentation is loading. Please wait.

Version 7, 4/2010 Onset for Pipeline TM. Version 7, 4/2010 TM I.1st Point Here a) Point One is Made Here b) Situational Analysis of Market Conditions.

Similar presentations


Presentation on theme: "Version 7, 4/2010 Onset for Pipeline TM. Version 7, 4/2010 TM I.1st Point Here a) Point One is Made Here b) Situational Analysis of Market Conditions."— Presentation transcript:

1 Version 7, 4/2010 Onset for Pipeline TM

2 Version 7, 4/2010 TM I.1st Point Here a) Point One is Made Here b) Situational Analysis of Market Conditions c) Another Agenda Item II. 2nd Point Appears Here a) Point One is Made Here b) Situational Analysis of Market Conditions c) Another Agenda Item © 2010 Onset Software Agenda

3 Version 7, 4/2010 TM Project Execution 12 – 15 Months Different SCPT Approaches © 2010 Onset Software Customization CVT MCL DesignStaging Data Prep 1 – 4 Weeks Commissioning and Line Out 2 – 4 Months 22 Days With Onset for Pipeline Onset for Pipeline Gets you to the Same Deliverable Faster, Cheaper, and at Dramatically Lower Risk While Maintaining Functionality

4 Version 7, 4/2010 TM Onset for Pipeline Gets you to the Same Deliverable Faster, Cheaper, and at Dramatically Lower Risk While Maintaining Functionality Different SCPT Approaches © 2010 Onset Software Project Execution 12 – 15 Months Customization CVT MCL DesignStaging Integrate Plan Validate Design Manage Insure Success of all Project’s Critical Factors Data Prep 1 – 4 Weeks Commissioning and Line Out 2 – 4 Months 22 Days With Onset for Pipeline

5 Version 7, 4/2010 TM Acquire necessary Project Data I.Data Prep Onset for Pipeline phases – Onset for Pipeline product 80% pre-defined and pre-configured 20% custom - Typically 50 PFD-type screens, Reports, Unique Device Configurations II.Plan phase Project setup, Charter, Schedule, Tracking, Reporting III.Design phase System Architecture, Data and Device Model, Staging Database, Demonstration, Training Onset Project Phases © 2010 Onset Software Integrate Plan Validate Design Data Prep Commissioning / Line Out Manage

6 Version 7, 4/2010 TM Solution-Based Project Time Savings Project-Summary Time Savings © 2010 Onset Software PlanDesignIntegrateValidateManageTotal Phase Reduction70% Total Project Time Savings 2% Plan 70% 2% Up to 70% time reduction for the Plan phase Up to 2% time reduction towards the Total project


Download ppt "Version 7, 4/2010 Onset for Pipeline TM. Version 7, 4/2010 TM I.1st Point Here a) Point One is Made Here b) Situational Analysis of Market Conditions."

Similar presentations


Ads by Google