Presentation is loading. Please wait.

Presentation is loading. Please wait.

Meeting #2 Superintendent Torlakson’s Advisory Task Force on Accountability and Continuous Improvement 1 11/10/2015.

Similar presentations


Presentation on theme: "Meeting #2 Superintendent Torlakson’s Advisory Task Force on Accountability and Continuous Improvement 1 11/10/2015."— Presentation transcript:

1 Meeting #2 Superintendent Torlakson’s Advisory Task Force on Accountability and Continuous Improvement 1 11/10/2015

2 Welcome & Agenda Review 2 11/10/2015

3  Make recommendations and build the highest possible levels of agreement for California’s new public accountability and continuous improvement system. 11/10/2015 3 Task Force Purpose

4 Meeting Date & LocationActivities September 21, 2015 – SacramentoEnvision what success would look like for California’s new system of accountability and continuous improvement. Identify priority focus areas for the task force. November 10, 2015 – Los AngelesDiscuss and come to agreement on the purpose of the system and the role of the state within the system. 11/10/2015 4 Meetings 1 and 2

5 Meeting Date & LocationObjectives A series of “deeper dive” conference calls will be scheduled in between in-person meetings. January 7, 2016 – OaklandIdentify required, suggested, and optional state dashboard measures and components. Review draft report framework. February 22, 2016 – SacramentoReview and refine agreed upon recommendations. Build consensus on draft report content. 11/10/2015 5 Future Meetings

6  California Department of Education Assessment Advisory Panel  State Board of Education Draft Framework and Implementation Plan 11/10/2015 6 Aligned Activities

7 Discuss and come to agreement on:  The purpose of California’s system of accountability and continuous improvement.  The role of the state within the system of accountability and continuous improvement. 11/10/2015 7 Objectives for Today

8  10:25 - Introductions and Warm-up Activity  10:40 – Building On Our Strengths  11:10 – Purpose of California’s Accountability and Continuous Improvement System  12:00 – Lunch and Full Group Q&A Session  1:00 – The State’s Role in the Accountability and Continuous Improvement System  2:40 – Closing  3:00 – Adjourn 11/10/2015 8 Agenda

9 11/10/2015 9 Introductions and Warm-up

10  Name  Organization 11/10/2015 10 Introductions

11  Take a sheet of colored paper  Close your eyes  Follow the verbal instructions 11/10/2015 11 Warm-Up

12  Engage in creative and candid discussion.  Use discretion when communicating about the process  Use agreed-upon talking points  Respect different perspectives 11/10/2015 12 Ways We Prefer to Work Together

13 11/10/2015 13 Building On Our Strengths

14 Blueprint 2.0 identifies four key elements for the accountability and continuous improvement system (refer to the agenda) 11/10/2015 14 Building On Our Strengths

15 In pairs or triads, respond to the following question:  What are strengths of and lessons learned from past accountability and continuous improvement efforts related to these four elements throughout the state that can be used as a foundation for the successful new system we are working to build? 11/10/2015 15 Building On Our Strengths

16 11/10/2015 16 Purpose of the System

17  To provide LEAs and educators with information needed to identify areas for improvement  To provide parents and students with information on how their schools are performing  To ensure that students are prepared for college and career  To identify successful districts and schools that can serve as models  To provide clarity on achievement gaps between key subgroups  To identify schools that are persistently failing to offer students the opportunity to succeed and target these schools for intervention and improvement efforts  To reduce disparities  To accurately reflect student learning progress 11/10/2015 17 Survey Results: Purpose

18  Turn to your neighbor and review the list of purpose areas. Identify any additions and record them on a pink index card (one per pair).  Then, join with another pair to review and consolidate additional purpose areas to add to the list. Record these on a yellow index card (one per group). 11/10/2015 18 Purpose of the System

19 Poll: http://tiny.cc/acitf 11/10/2015 19 What is the Purpose of the System?

20 11/10/2015 20 Lunch

21 11/10/2015 21 Q&A

22 11/10/2015 22 The State’s Role in Accountability and Continuous Improvement

23  In small groups, respond to the following question: What is the role of the state in fulfilling this purpose area of the system? 11/10/2015 23 State’s Role

24  Brief presentations from small groups  Are there additional state roles? 11/10/2015 24 State’s Role

25 11/10/2015 25 Closing

26 11/10/2015 26 Next Steps

27 Meeting Date & LocationObjectives A series of “deeper dive” conference calls will be scheduled in between in-person meetings. January 7, 2016 – OaklandIdentify required, suggested, and optional dashboard measures and components. Review draft report framework. February 22, 2016 – SacramentoReview and refine agreed upon recommendations. Build consensus on draft report content. 11/10/2015 27 Future Meetings

28  What is one thing that is important for us to remember and carry forward in our work together?  Poll: pollev.com/gpgpolls 11/10/2015 28 Poll

29 29 Thank you! 11/10/2015


Download ppt "Meeting #2 Superintendent Torlakson’s Advisory Task Force on Accountability and Continuous Improvement 1 11/10/2015."

Similar presentations


Ads by Google