T-76.115 Project Review WellIT I2 Iteration 7.2.2005
2
2 T-76.115 Project Review Agenda Project status (5-10 min) achieving the goals of the iteration project metrics Work results (20-25 min) presenting the iteration’s results demo Used work practices (5-10 min)
3
3 T-76.115 Project Review Status of the iteration’s goals Goal 1: Requirements Three new requirements No other changes Goal 2: Architecture and Design Architectural design of the product is finished. Test cases for all modules defined. Goal 3: UI studies Usability tests run Goal 4: Implementation (implemented/total) Use cases: 13 / 15 Functional requirements: 32 / 44 Only one essential requirement not implemented No conditional or optional requirements implemented for PUD Goal 5: User's manual Draft done No much contents yet Goal 6: Testing Module testing done Some integration testing done (will be continued in the next iteration)
4
4 T-76.115 Project Review Status of the iteration’s deliverables Project Plan OK Requirements document OK Technical Specification Outdated UI proto OK Game design No changes Test Cases New test cases for MAP and SIC Test report and Test log OK SEPA diaries OK
5
5 T-76.115 Project Review Realization of the tasks (Major) discrepancies No contents generated for User's manual Only one customer meeting held Other project management: Project manager has not reported all hours Project plan needed no (major) updates
6
6 T-76.115 Project Review Working hours by person Total amount quite close Project management requires a lot of work The biggest problem is the bias of undone hours – some have to do way more than others in the last iteration Realized hours in this iteration Plan in the beginning of the iteration Latest plan
7
7 T-76.115 Project Review The biggest problem Work is done later rather than earlier
8
8 T-76.115 Project Review Quality metrics Unit testing was reduced considerably Only two JUnit classes done Test cases (passed/run) POT 2 / 3 (3 total) PUD 8 / 9 (12 total) MAP 4 / 5 (5 total) SIC 2 / 4 (4 total) All documents reviewed
9
9 T-76.115 Project Review Quality assessment Much more testing must be done Some problems caused by bugs in mobile devices All documents reviewed Some documents are outdated Legend Coverage: 0 = nothing 1 = we looked at it 2 = we checked all functions 3 = it’s tested Quality: = quality is good = not sure = quality is bad
10
10 T-76.115 Project Review Software size Code line metrics are quite useless in this project because... MupeS and MupeC are based on existing software Hard to separate code wrote by us from the original PUD contains both Java and PHP code Metrics not accurate ...so, our contribution to the code base in bytes:
11
11 T-76.115 Project Review Changes to the project The project manager changed Minor changes due to Process Tuning SEPA Agendas earlier to TWiki Responsibilities dealt among group members when writing weekly reports One studies, teaches other No typos to document reviews Changed to ad-hoc approach with Demo game No formal requirements No test cases But will follow the UI Proto very closely
12
12 T-76.115 Project Review Risks What is the current situation regarding the risks? No materialized risks New identified and analysed risks: 1 Currently analysed risks: 28
13
13 T-76.115 Project Review Results of the iteration Technical Specification User's Manual Usability SEPA (updated) Progress Tracking SEPA (updated) Test-Driven Development SEPA (updated) Process Construction and Tuning SEPA (updated) Second increment of POT and PUD First increment of MAP and SIC Demo game No major changes Project Plan Requirements Document (3 new requirements) Game design UI proto (results of the usability tests are put straight to the Demo game)
14
14 T-76.115 Project Review Results of the iteration: Technical Specification Technical specification document is severely outdated A lot of documenting must be done in the next iteration Technical specification in various plain files, papers, etc. -> must be transferred to the TS
15
15 T-76.115 Project Review Results of the iteration: User's Manual Will be in HTML format Draft done Not much content
16
16 T-76.115 Project Review Results of the iteration: Usability SEPA Usability tests done Found some issues in the UI proto Affects the demo game
17
17 T-76.115 Project Review Results of the iteration: Progress Tracking SEPA The change of the project manager changed also the author of this SEPA No major changes Frequent updates to diary
18
18 T-76.115 Project Review Results of the iteration: TDD SEPA SIC done using TDD Time consuming Suitability for this project questionable
19
19 T-76.115 Project Review Results of the iteration: Process C&T SEPA A workshop held in the end of I1 iteration Changes took place in the start of I2 iteration Process repeated again in the end of I2 iteration
20
20 T-76.115 Project Review Results of the iteration: POT and PUD PUD is usable, tested and working Not much effort put on POT in this iteration An external library used Needed porting from J2SE to J2ME Works nonetheless
21
21 T-76.115 Project Review Results of the iteration: MAP and SIC Both working Essential features implemented Needs testing to gain robustness
22
22 T-76.115 Project Review Results of the iteration: Demo game General concepts of the demo game are working No content yet
23
23 T-76.115 Project Review Used work practices Following work practices were used Iteration planning Time reporting Documenting Publishing and reviewing practices Requirements change Usability tests Version controlling Coding conventions Defect tracking Risk management Communication practices Practices to be tried out No new practices (except those mentioned in Process C&T SEPA) All practices are detailed in project plan and/or appropriate documents
24
24 T-76.115 Project Review Experiences from practices Iteration planning New project manager -> no experience in planning The plan came true amazingly well Time Reporting Works in general Occasionally people postpone the reporting ...and some hours are not reported at all Requirements Management The defined management process seems to be too heavy weight Not much happening with the requirements Version Controlling Works fine Some unnecessary commits to the repository, but luckily one can always go back to a previous version
25
25 T-76.115 Project Review Experiences from practices Code Conventions Working well Some pretty printing must be done License texts must be added to every code file Defect Tracking Bugzilla in use Complex system -> steep learning curve But useful Usability tests Worked well A lot of valuable input Overkill for this project Risk Management Working well Communication Practices Working well