Presentation is loading. Please wait.

Presentation is loading. Please wait.

SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015.

Similar presentations


Presentation on theme: "SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015."— Presentation transcript:

1 SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015

2 Pre-R&D list (cost/manpower) for SoLID sub-systems: A)EC (including SPD): simulation/design, testing critical components (fibers, MAPMT, fine-mesh PMT, radiation hardness) and establish capability to produce modules Year 1: procurement $122K, manpower: 1 postdoc, 1 grad student, 3 summer undergraduates, 0.1 physicist, 0.15 engineer Year 2: procurement $ 84K, manpower: 0.25 postdoc, 0.75 grad student, 0.33 physicist, 0.25 engineer Total procurement $206K + manpower  Shandong U funding. B)Software: 2 postdoc x 3 years (one for simulation, one for tracking/analysis framework)  Update from Ole + Seamus C) DAQ: Y1: procurement $65.5K, manpower: 0.5 postdoc, 0.5 student Y2: procurement $53K, manpower: 0.5 postdoc, 0.5 student Y3: procurement $33K, manpower: 0.5 postdoc, 0.5 student Total $151.5K  JLab DAQ/FastElectronics Group List Discussed with Physics Division (June)  Update

3 D) LGC: procurement $48K, manpower 1.5 FTEY  See Michael’s slide E) HGC: procurement $154K (in addition to expected $74K contribution from Canada and already purchased $42K for 16 MAPMTs) manpower: 1 FTEY postdoc, 0.75 FTEY engineer (in addition to expected contribution from Duke side of 0.5 postdoc, 1 grad student, and 0.25 engineer)  Will know Canadian funcing in October? F) MRPC electronics R&D support: procurement $66K, manpower 0.5 FTEY  Needs update G) GEM support: procurement $190K (including $50K for APV 25 FEEs), manpower 2.35 FTEY  See Nilanga’s slide  Slow Control? List Discussed with Physics Division (June) (cont)

4 Michael Paolone

5 5 SoLID GEM R&D activities requiring funding at UVa and TU Small investments in pre R&D pay big dividends at final R&D and production. While a significant progress towards SoLID GEMs accomplished within the EIC R&D program some SoLID specific funding needed. Following is a rough estimate for the first year of SoLID GEM pre-R&D UVa $ 20 k : Components and manpower for a Solid prototype design. TU $ 20 k: Design and fabrication costs for SoLID specific GEM foils and chamber components. UVa/TU $ 40 k: Funds to host Chinese collaborators for extended visits. Purchase single mask foils from CIAE and build and characterize prototypes. Nilanga Liyanage


Download ppt "SoLID Pre-R&D List SoLID Collaboration Meeting September 11-12, 2015."

Similar presentations


Ads by Google