C HARLOTTE C OUNTY B EACHES & S HORES A DVISORY C OMMITTEE J ANUARY 7, 2016 C HARLOTTE C OUNTY E ROSION C ONTROL P ROJECT U PDATE
2
Manasota Key: Install low crested permeable rock groin, Place approximately 180K CY (Offshore Borrow Area/Stump Pass Channel) Stump Pass: Conduct maintenance dredging of Navigation Channel (150 ft wide by 9 ft deep on inside and 300 ft wide by 11 ft deep on outside); place approximately 70K CY (Stump Pass Channel) on southern shoreline Knight-Don Pedro Islands: Place approximately 200K CY (Offshore Borrow Area) on gulf-front beach Opinion of Probable Construction Cost = $7.5 Million Funding Sources = MSBU, MSTU, TD Tax, Boater Funds, WCIND, DEP Beach Management Funding Assistance Permit Status: DEP & USFWS BO Issued, NMFS Consultation Issued; Waiting on USACE Permit 2016 P ROJECT
3
Beach Renourishment of Current Project (avg. 8-Yr cycle) Beach Nourishment of Additional Segments (e.g. County Englewood Beach Park to State Park Beach, and Palm Island inlet and gulf-front shorelines) Periodic Maintenance Dredging of Stump Pass Navigation Channel (avg. 4-Yr Cycle) Operation, Monitoring & Maintenance Elements – Conduct Annual Monitoring (Physical and Biological) – Adjust Permeability of structure, minor repairs to structure – Place sand for ebb shoal reformation if not meeting FDEP goals – Place supplemental fill on Hot Spots, Sand Sharing – Maintain flushing within Rum Cove Lagoon F UTURE A CTIVITIES
4
Bid the Project After Receipt of Federal Authorization – Start Bid Process end of March with advertising for 30 days – Bid Opening at end or April with award in May – Set Notice to Proceed for July 11 Updated Construction Schedule (Original in Red) – Mobilization in July – Offshore Borrow sand placement on Knight/Don Pedro Island Aug-Oct (July – Aug) – Dredge Stump Pass Oct-Nov (Apr – Jun) – Manasota Key Work (Structure and Backfill) Nov-Jan (Mar – Apr) Justification: As we do not have the Federal Authorization or State Park Easement, we would be imposing an impossible timeline for potential contractors to achieve. The USFWS BO dictates that all work needs to be accomplished on Manasota Key by May 1 st. By setting the timeline for work to start late summer and allowing ample time for the contractors to plan, mobilize, and complete the work; we should receive more favorable bids. U PDATED B ID P ROCESS
5
Potential Impacts: – Navigation through Stump Pass delayed by up to 4 months – Sand Placement on Knight/Don Pedro delayed by 1 month – Work on Manasota Key delayed by 9 months – Could impact the conduct of Waterfest 2016 on the south end of Manasota Key and Stump Pass; however, we could consider having the contractor halt actions during the event (pending no cost implications) Potential Benefits: – Opportunity for more Favorable Bids due to better planning horizon and timeline – Avoids “Height” of rental season on Palm/Knight/Don Pedro Islands – Operating within Permit required Environmental Windows reduces impacts to Threatened and Endangered Species (Nesting Turtles and Shorebirds) which may result in cost savings (Reduced BMP’s outside of nesting season) – Additional time to ensure Bid Package facilitates project goals P OTENTIAL I MPACTS AND B ENEFITS BY D ELAYING THE P ROJECT