Procedures for Wind resource assessment and their impact on the levelized cost of Energy (based on the MEGAVind cost model), Head of Section Hans E. Jørgensen, DTU Wind Energy & Lars Landberg Group Leader, Renewables. Strategic Research and Innovation DNV GL – Group
2
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Motivation What is the relation between the economy of a wind farm project and uncertainty? Is it really necessary to use development expenses (DEVEK) and how are these related to the Levelized Cost of Energy LCOE?
3
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Some definitions
4
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Vesterhav syd (an example) 20 x 10 MW 1031 GWh
5
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Production based on mesoscale models 22 submission: Location: Høvsøre Level : 100 m 1 year, 10 min averages of U and D Reference Høvsøre mast Production estimates: ± 15 %
6
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Assumptions ------ AEP input 1031 ;FixedAEPinputPrYear [GWh] ------ CAPEX 1.50 ;TurbinePriceSimple [M€/MW] 0.600 ;FoundationPriceSimple [M€/MW] 0.080 ;ElecInfraPriceSimple [M€/MW] 0.040 ;OtherInfraPriceSimple [M€/MW] 0.350 :AssembInstalPriceSimple [M€/MW] ------ OPEX input 0.02 ;OPEX cost €/kWh ------ Capital input 25 ;NYears 0.30 ;EquityPCT [fraction] 0.05 ;RateDebt [fraction] 0.12 ;RateMarket[fraction] 0.03 ;RateRiskFree [fraction] 1.70 ;CompanyRiskProfile [fraction] 0.30 ;TaxRate [fraction] 0.02 ;Inflation Fraction --- Wind farm 20 ;Number of turbines 138.0 ;HubHeight [m] 10.0 ;RatedPower [MW] 220.0 ;Diameter [m] 0.90 ; AEPlossFactor ------ DEVEX input 20.0 ;DEVEX cost M€ 3 ;OffsetYearsDEVEX
7
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Economical constraints DSCR has to be 1.3 based on the P90 production estimate (over 10 year) The P90/P50 ratio determines the size of the debt i.e the ratio between Equity and Debt combined with the DSCR of 1.3 Assume calculations give E:ratio of 30 %
8
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” LCOE as function of Equity ratio Increase the Devek with 10 Meuro (tower offshore) Decrease uncertainty from 12% to 7 % equals Equity from base case 30% to 25%
9
DTU Wind Energy, Technical University of Denmark Add Presentation Title in Footer via ”Insert”; ”Header & Footer” Summary The uncertainty of a project determines the amount equity you need to put in your project and vice versa also determines how big the senior debt can be (loan with a very low interest rate). Measurements on location is necessary to reduce the uncertainty and even if the tower cost 10 Meuro this can be paid back over 3-4 years on Vesterhav syd. Highly qualified consultants can be of large value for the economics in a project