Meal Management System Solution For:By: 25 Jan 2013, South Africa South African National Defence Force
2
Project Background Overview SA National Defence Force wants to implement a Meal Management System (MMS) to monitor and control the meal consumptions by soldiers. ✓ No control over the data for soldiers having how many meals a day or month ✓ MMS will help bringing down the huge massive financial losses to zero. ✓ MMS will make sure that no soldier loses out on meal due to meal consumption more than once by other soldiers 2
3
At Main gate Soldier will enter in the dining hall He will get authenticated based on 1.Finger print + Emp ID 2.His meal matrix 3.Time of the meal At Kitchen Station He will get authenticated based on 1.Finger print 2.His meal matrix 3.His main gate validation After Validation The Screen will display 1.His name and Grade 2.Photo 3.Type of Meal Meal Attendant Based of his type of meal he will serve the meal 1.Normal 2.Special diet 3.Bulk meal Dining Hall Exit Soldier will exit using the bio- metric again Back Office help desk Call “Back office” in case of any issues with Access control
4
Information & Validation All the information will be validated and stored in the RDBMS database server in the Back office and the Finger print device. RDBMSRDBMS Data Storage
5
Solution Overview Meal Management Meal Management Server Profiles Monthly meal credit Meal scheduling Meal transaction Reconciliation Balance checks Access services Administration –HR web app RDBMSRDBMS Biometric Access Control Server http/s 5
6
1.Finger prints will be captured in database in MMS 2.Manager will create & notify Meal Matrix including “Bulk meal plan” for each soldier periodically in MMS 3.Meal menu will be created in MMS and inventory control/reorder level etc. 4.Physical installation of Bio metric reader and turnstile will be carried out by vendor who is providing the respective equipments 5.Application interface with Vendor’s Hardware devices will be carried out using vendor’s SDK and coordination with vendor’s technical team. 6.There will be data flow between MMS and vendor’s devices. 7.Reports and analytics will be generated in MMS Project elements Overview 6
7
Dependency ✓ SDK from bio metric/turnstile vendor and communication with technical team of that vendor ✓ SSET to provide the necessary hardware to India office for exact integration testing. 7
8
Next Steps 1.Final Proposal Submission 2.Agreement on Project Scope 3.Agreement on Commercial Proposal 4.Work Order Sign Off 5.Project Kickoff 8
9
Phase II 1.Maintenance and tracking of raw material inventory 2.Inventory level & reordering 3.Integration with CCTV 4.Any other suggestions 9