Download presentation
Presentation is loading. Please wait.
Published byClaire Shaw Modified over 9 years ago
1
AAE 450 Spring 2008 Danielle Yaple 6 March 2008 Avionics Group, GC, CAD, MAT Costs 1
2
AAE 450 Spring 2008 Final Costs Avionics 2 UnitCosts Wiring – Materials$500 - Installation$7500 CPU$10,000 IMU$15,000 Sensors (500 each)$8.000 Battery$10,000 Range Safety$20,000 Ground Tracking$24,000 Total$95,000
3
Cost Proportion AAE 450 Spring 20083
4
Cost Data 200 g Case Tank Cost$2,121,200 Prop Cost$4,883 Engine Cost$1,023,312 Prop Cost Mod$44,163 Total Cost 200g$3,193,575 AAE 450 Spring 2008 Avionics 4 1 kg Case Tank Cost$1,875,700 Prop Cost$3,118 Engine Cost$930,887 Prop Cost Mod$44,163 Total Cost 1 kg$2,853,850 5 kg Case Tank Cost$2,652,800 Prop Cost$10,492 Engine Cost$1,559,275 Prop Cost Mod$44,163 Total Cost 5 kg$4,266,738
5
AAE 450 Spring 20085
6
6
7
7
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.