Download presentation
Presentation is loading. Please wait.
Published byIrma Shaw Modified over 9 years ago
1
WECC Frequency Contour for Opening Palo Verde 1 and 2 6 Seconds of Simulation Thomas J. Overbye Fox Family Professor of Electrical and Computer Eng University of Illinois at Urbana-Champaign overbye@illinois.edu
2
Pre-Loss of Generation 2
3
0.2 Seconds after Contingency
4
0.4 Seconds after Contingency
5
0.6 Seconds after Contingency
6
0.8 Seconds after Contingency
7
1.0 Seconds after Contingency
8
1.2 Seconds after Contingency
9
1.4 Seconds after Contingency
10
1.6 Seconds after Contingency
11
1.8 Seconds after Contingency
12
2.0 Seconds after Contingency
13
2.2 Seconds after Contingency
14
2.4 Seconds after Contingency
15
2.6 Seconds after Contingency
16
2.8 Seconds after Contingency
17
3.0 Seconds after Contingency
18
3.2 Seconds after Contingency
19
3.4 Seconds after Contingency
20
3.6 Seconds after Contingency
21
3.8 Seconds after Contingency
22
4.0 Seconds after Contingency
23
4.2 Seconds after Contingency
24
4.4 Seconds after Contingency
25
4.6 Seconds after Contingency
26
4.8 Seconds after Contingency
27
5.0 Seconds after Contingency
28
5.2 Seconds after Contingency
29
5.4 Seconds after Contingency
30
5.6 Seconds after Contingency
31
5.8 Seconds after Contingency
32
6.0 Seconds after Contingency
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.