Presentation is loading. Please wait.

Presentation is loading. Please wait.

B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011.

Similar presentations


Presentation on theme: "B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011."— Presentation transcript:

1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011

2 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2 Background  Prior to recent CFL updates, a single savings value was attributed to all delivery mechanisms  During CFL updates, savings were changed to be reflective of delivery mechanism  Only retail and direct install measures updated by the RTF  For programmatic tracking, measures listed in the PTR were and continue to be split out across other delivery channels, but retail savings assumptions were used  Direct mail  Non-requested  Requested  The RTF has requested that BPA bring the direct mail measure to the RTF for approval for its own savings value

3 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 3 Overview – Direct Mail CFLs  Objective Approval of CFL savings under direct mail delivery mechanisms, same as retail measure Separate kWh/lamp savings for standard and specialty CFLs  Data  Engineering  RTF approved residential CFL (2011) and residential specialty CFL (2010) analyses  Storage and Removal  BPA direct mail participant survey and literature review (2010)  Cost  Fluid Market Research direct mail program costs  Results and Proposal

4 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 4 BPA Lighting Report  In 2010, BPA contracted with RIA to provide a lighting assessment of Residential Direct Distribution CFLs  Objective - programmatic review of the distribution of CFLs to residential ratepayers through direct mail or direct-install activities.  Telephone surveys with 202 participants across seven utilities Final Report / Lighting Program Assessment: Residential Direct Distribution, June 15, 2010 Funded by Bonneville Power Administration, Prepared by Research Into Action, Inc. http://www.bpa.gov/energy/n/reports/evaluation/pdf/Residential_CFL_Final.pdf

5 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 5 Installation Rates of Direct Mail Bulbs  The table below is a summary of the weighted average installation rate, which varies depending on the number of bulbs shipped in the direct mailing  Weighted average of 60% Self-reported, mix of specialty and standard bulbs  Based on the results of the study, BPA is considering it best practice to limit the number of bulbs in a non-requested direct mail package to 4 bulbs.

6 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 6 Literature Review Final Report / Lighting Program Assessment: Residential Direct Distribution, June 15, 2010 Funded by Bonneville Power Administration, Prepared by Research Into Action, Inc. http://www.bpa.gov/energy/n/reports/evaluation/pdf/Residential_CFL_Final.pdf

7 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 7 Conclusion on Installation Rates for Direct Mail  For both specialty and standard CFLs, use installation rates consistent with retail bulbs (64%)  Recent research shows reported install rates: ~60%  Literature review install rates: ~70%  Current retail standard CFL install rate: 64%  Direct mail studies consistently show results that are not significantly different from this  Current retail specialty CFL install rate: 80%  Completed research does not distinguish between types

8 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 8 Cost Analysis  Program cost data from Fluid Market Research

9 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 9 Cost Analysis  Program cost data from Fluid Market Research

10 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N  Comparison of deemed and proposed parameters and results 10 Results

11 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 11 Proposal #1 – Standard CFLs  Accept direct mail delivery mechanism savings, using the following site savings de-rating factors for standard CFLs  Storage rate (36%)  Removal rate (4%)  Δwatts and hours-of-use parameters are the same as the deemed retail values.  Result: 15.0 kWh

12 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 12 Proposal #2 – Specialty CFLs  Accept provisional direct mail delivery mechanism savings, using the following site savings de-rating factors for specialty CFLs  Storage rate (36%)  Removal rate (4%)  Δwatts and hours of use parameters are the same as the deemed retail values.  Result: 14.5 kWh  Accept research plan for collecting data on specialty bulbs

13 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 13 Research Proposal for Specialty CFLs  Through participant phone surveys, collect the following information:  Number and type of specialty bulbs received  Number and type of specialty bulbs installed  Why bulbs were not installed  If non-installed bulbs were:  Placed in storage  Removed after installation  Disposed of  Planned future installation of specialty bulbs

14 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 14 Questions

15 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 15 Standard CFL – Measure Summary

16 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 16 Standard CFL – Measure Summary

17 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 17 Standard CFL – Measure Summary

18 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 18 Specialty CFL – Measure Summary

19 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 19 Specialty CFL – Measure Summary

20 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 20 Specialty CFL – Measure Summary

21 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 21 Standard CFL – Guidelines Checklist

22 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 22 Standard CFL – Guidelines Checklist

23 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 23 Standard CFL – Guidelines Checklist

24 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 24 Specialty CFL – Guidelines Checklist

25 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 25 Specialty CFL – Guidelines Checklist

26 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 26 Specialty CFL – Guidelines Checklist


Download ppt "B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Direct Mail CFLs Ryan Firestone and Carrie Nelson August 30, 2011."

Similar presentations


Ads by Google