Item Th11b San Diego Gas and Electric Substation Relocation Project Chula Vista, San Diego County
3
Substation Relocation Project Components 1.Demolition of existing South Bay substation 2. Transmission Corridor Improvements 3. Construction of new Bay Boulevard substation
4
Key Coastal Act Issues Biological Resources Visual Resource
5
Biological Resources Impacts to vegetation and wildlife – Natural Community Conservation Plan policies – Biological monitoring – Mitigation for impacts to native vegetation Impacts to wetlands – 2.45 acres of existing wetlands will be filled – 10+ acres of restoration at the D Street fill site
7
Visual Impacts: South Bay Substation Demolition Improvement to the visual landscape Consistent with the Chula Vista Bayfront Master Plan Existing Conditions Proposed
8
Visual Impacts: New Bay Boulevard Substation Generally visually compatible with the character of the surrounding area Consistent with CVBMP Blocks existing views of the Bay across a currently undeveloped site Existing Conditions Proposed
9
230 kV Undergrounding Underground 300 OR 1000 feet of the incoming 230 kV line
10
Concerns with Undergrounding 230 kV line Site-specific technical/operational challenges Importance of maintaining feed line above ground Construction-related impacts could be significant Could result in significant time delays
11
138 kV Undergrounding Proposed Existing Conditions Proposed with Special Condition 14