Replacement of Obsolete/Old Hardware L. Ducimetière SPS Consolidation Review Luc Sermeus, Mike Barnes, Viliam Senaj, Thomas Kramer, Luis Feliciano, Vasco Namora, Remy Noulibos, Patrick Faure, Francesco Castronuovo
3
Talk Overview Refurbish oil systems Upgrade MKP switches (thyratron type) New MKDV generators (and controls) Eradicate horn pulser ignitron switches
4
Refurbish oil systems Concerns CPS systems, with 2 objectives: Improve safety by replacing mineral oil (DIALA) by ESTER oil Improve system reliability by renovating old system Status: Done in MTE, PSB EK/TK, AD horn, LEIR, ISOLDE On-going in CT, AD / ELENA, Lab.867 Still to be done in PS TIK and FAK kCHF FTE WU statusBCActivity2014201520162017201820192020 Active65218Refurbish oil systems808890 0.251.250.920.75 1.10 To be implemented over several years with constant budget
5
Upgrade MKP switches (thyratron type) CX1171B under-dimensioned for the pulse i dt CX2503 « newly » developped for MKI features higher i dt, and very large gas reservoir. CX2503 also used in LHC-MKI and SPS-MKE. Already started on Dump switches (1 in operation + 1 spare, 9 remaining) 8 Main switches to be treated during the 100 ns LIU project (full switch to be redesigned for 2 thyratrons) kCHF FTE WU statusBCActivity2014201520162017201820192020 Active65712Upgrade MKP switches (thyratron type)30 0.300.200.180.550.600.45 Consists in replacing old type CX1171B by new CX2503 :
6
New MKDV generators and controls Redesigned 2 proto PFN ready for switch test in Lab.867 “Quad-stack” GTO switch design well advanced start to build a proto in 2015 Regular strategy meetings EC-FPS on-going to validate key elements and functionalities To be integrated in SPS-LIU ? Split EC / FPS budget kCHF FTE WU statusBCActivity2014201520162017201820192020 Active65711New MKDV generators and controls30160 24519915 0.650.900.751.051.100.95 x 40
7
Eradicate horn pulser ignitron switches Ignitron switches are a safety issue (ref. BA3 fire in 1997 : 10MCHF cleaning, 10 weeks lost for operation) Technically easy to replace +/- copy of MKDH GTO switch Need full cleaning of cubicles Erosion evidence found in test cubicle Need new trigger system ? kCHF FTE WU statusBCActivity2014201520162017201820192020 Approved99215[AD] Horn ignitron mercury switches phase-out15100 30 0.601.450.00