US Army Corps of Engineers BUILDING STRONG ® Mid-Columbia River Projects and Large Spill Events Ken Duncan Portland District PM Environmental Compliance & Sustainability September 22, 2015
2
BUILDING STRONG ® PORTLAND DISTRICT 2
3
BUILDING STRONG ® PORTLAND DISTRICT 3 Bonneville Lock and Dam
4
BUILDING STRONG ® PORTLAND DISTRICT 4 Bonneville Lock and Dam
5
BUILDING STRONG ® PORTLAND DISTRICT 5 Fishways Oiling could lead to fish avoidance. Fishways have permanent boom installed. Shutting down the fishway will impact Spring Chinook, Steelhead, and Lamprey.
6
BUILDING STRONG ® PORTLAND DISTRICT 6 Spillway Intake is 30’ below surface. Seasonal spill to improve downstream fish passage.
7
BUILDING STRONG ® PORTLAND DISTRICT 7 Powerhouse(s) Intake depth is ~70’ below surface. Turbines are not impacted by oil.
8
BUILDING STRONG ® PORTLAND DISTRICT 8 Assets / Actions for Unified Command Fishway shutdown. ► Endangered Species Impacts? Flow modification from Spill to Power Generation ► May improve capability of holding oil upriver of Bonneville. ► Endangered Species Impacts? ► Spill is mandated by Biological Opinion. River flow modification for response.
9
BUILDING STRONG ® PORTLAND DISTRICT 9 Questions? Ken Duncan Portland District PM Environmental Compliance & Sustainability (503) 808-4323 Kenneth.d.duncan@usace.army.mil