Presentation is loading. Please wait.

Presentation is loading. Please wait.

DIT Campus Network 2G1713 Communication Systems Design, 2004 Department of Microelectronics and Information Technology, KTH Team Members Honoratha Shayo2G1713.

Similar presentations


Presentation on theme: "DIT Campus Network 2G1713 Communication Systems Design, 2004 Department of Microelectronics and Information Technology, KTH Team Members Honoratha Shayo2G1713."— Presentation transcript:

1 DIT Campus Network 2G1713 Communication Systems Design, 2004 Department of Microelectronics and Information Technology, KTH Team Members Honoratha Shayo2G1713 Vincent Jacob 2G1713 Ivan Masue2G1713 Fredrik Andersson2G1713 Ombeni Mnzava2G1713 Sylvester Kimbi 2G1713

2 Background Goals Working Model What has been done Work to be done SWOT Analysis Questions and answers Contents

3 Background DIT (Dar-Es-salaam Institute of Technology) Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

4 Background cont…. ICT situation at DIT 21 buildings to be connected, currently only two computer labs are networked Users of the network 1800(+) Students 450(+) Staffs SIDA Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

5 Goals Primary goal Design and deploy the core of the DIT campus network, which will include: Basic Internet network DNS, DHCP, dial-up, Web, E-mail Database and Web server Training of system administrators and the users of the network Secondary goal Connecting DIT to TIX Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

6 Working model The entire project has been divided into major tasks Project management Team activities Deliverables Lectures and seminars Network development Web-site development and updating Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

7 What has been done so far Network design and specifications Test bed Procurement Training Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

8 Work to be done DIT campus network Backbone connectivity Internet connection Connecting existing network to the backbone Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi Training system administrators and end-users

9 DIT campus backbone map Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

10 Backbone connectivity Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

11 The current Internet connection Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

12 The new Internet connection Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

13 SWOT Analysis A method to identify the project's internal Strengths and Weaknesses and to review external Opportunities and Threats to the project. Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

14 Well motivated team Close cooperation with other teams Different areas of technical knowledge Strengths Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

15 Lack of experience in working on project Weakness Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

16 Working with external experts in different areas With the implementation, the DIT will have the opportunity to enjoy the network services Opportunities Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

17 Equipments delivery delay Passive network Deployment Delay Threats Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

18 Questions and answers Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi

19 Thank you for listening ! For further information visit our web at http://www.csd.ssvl.kth.se/~csd2004-team7 Communication Systems Design 2004 Csd2004-team7@csd.ssvl.kth.se DIT Campus Network: Monday, March 22, 2004 Ufumbuzi


Download ppt "DIT Campus Network 2G1713 Communication Systems Design, 2004 Department of Microelectronics and Information Technology, KTH Team Members Honoratha Shayo2G1713."

Similar presentations


Ads by Google