Download presentation
Presentation is loading. Please wait.
Published byBeverley Anthony Modified over 9 years ago
1
+132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution in B865 (not yet approved)
2
FPS Storage EC software lab EC Lab. BEC Lab. CEC Lab. AEC Power Lab. EC Storage Mechanical workshop 19.85 Conference Room Printers/ Photocopiers CAD Ofice 865 1-D 865 2-D 865 2-A 22222221222121212121313233313131 EC Monitoring Room SLSecretariat SLGL 22212222212221222222 SL 213333323131323222212221222221222221 Production Office 3 FSU SL CAD Office Present TE-ABT distribution in B865
3
EC software lab EC Lab. BEC Lab. CEC Lab. AEC Power Lab. EC Storage Mechanical workshop 19.85 Conference Room Printers/ Photocopiers 865 1-D 865 2-D 865 2-A 22222221222121212121313233313131 EC Monitoring Room 19.9 SLSecretariat SLGL 22212222212221222222 SL 2133333231313232222122212221222221 Production Office 3 FSU SL CAD Office Proposed TE-ABT distribution in B865 22
4
Proposed TE-ABT-EC reconfiguration in B865 CAD Office 44 22 21 3 new HT Test Cages with temporary equipment test bench storage Operational equipment returns, repair and calibration Operational Spares
5
CAD Office 1 x STAFF (1 x STD) CAD Office 1 x STAFF CAD Office 3 x FSU 1 x TTE CAD Office 1 x STAFF 1 x STD 17.7 m216.9 m2 32 m2 19.2 m2 44 22 21 21 Cupboard wall to ceiling (sliding doors) Preferred Option, 7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
6
35.2 CAD Office (Remy) 1 x STAFF (1 x STD) CAD Office (Wim) 1 x STAFF CAD Office (Stephane) (Yves) (Gregory) (Remi) 3 x FSU 1 x TTE CAD Office (Patrick) (Lorena) 1 x STAFF 1 x STD 17.7 m216.9 m2 32 m2 19.2 m2 44 22 21 21 Cupboard wall to ceiling (sliding doors) Preferred Option (with names), 7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
7
CAD Office 1 x STAFF CAD Office 3 x FSU 1 x TTE 1 x STD CAD Office 2 x STAFF 16.9 m2 32 m2 19.2 m2 45 22 21 Cupboard wall to ceiling (sliding doors) Alternative Option, 7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
8
35.2 CAD Office (Wim) 1 x STAFF CAD Office (Stephane) (Yves) (Gregory) (Remi) (Lorena) 3 x FSU 1 x TTE 1 x STD CAD Office (Patrick) (Remy) 2 x STAFF 16.9 m2 32 m2 19.2 m2 45 22 21 Cupboard wall to ceiling (sliding doors) Alternative Option (with names), 7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)
9
6m x 7.5m B355: LIU-PSB Montage a Blanc
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.