1 09 October 2007 1 SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.

Similar presentations


Presentation on theme: "1 09 October 2007 1 SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor."— Presentation transcript:

1 1 09 October 2007 1 SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor

2 2 09 October 2007 2 SOIS AREA REPORT CONTENTS A.CURRENTLY ACTIVE WGs AND BOFs WITHIN AREA B.SUMMARY DOCUMENT STATUS C.SUMMARY TECHNICAL STATUS OF EACH WG & BOF D.INTRA & CROSS-AREA TECHNICAL ISSUES E.OTHER ISSUE AND CONCERNS F.RESOLUTIONS FROM THIS MEETING

3 3 09 October 2007 3 1.Application Support Services WG 2.Subnetwork Services WG 3.Plug and Play BOF 4.Wireless BOF 5.Transducer BOF – Work terminated (absorbed) A.LIST OF CURRENT WGs AND BOFs WITHIN AREA SOIS AREA REPORT

4 4 09 October 2007 4 WG Document NumberStatus Spacecraft onboard interface services850.0-G-1 Application Support Services Device Access Service Device Data Pooling Service Time Access Service File Access Service Device Enumeration Service Device Virtualisation Service 871.0-R-1 871.1-R-1 872.0-R-1 873.0-R-1 Under preparation Under Preparation Subnetwork Services Subnetwork Packet Service Subnetwork Memory Access Service Subnetwork Time Distribution Service Subnetwork Device Discovery Service Subnetwork Test Service 851.0-R-1 852.0-R-1 853.0-R-1 854.0-R-1 855.0-R-1 SOIS AREA REPORT Documents

5 5 09 October 2007 5 1.Application Services Working Group Goal: Develop SOIS Application support layer services and associated protocols if required Working Group Summary progress: Rid review completed, Red book update underway Agreement reached on use of AMS Plug and play approach agreed with P&P BOF Problems and Issues: Prototyping delay Working Group Summary Situation: SOIS AREA REPORT status:OKCAUTIONPROBLEM comment: Pending prototyping and red book development

6 6 09 October 2007 6 2.Subnetwork services Goal: Develop SOIS Subnetwork Services and associated protocols if required Working Group Summary progress: Rid review completed, Green book updated, Red book update underway Previous meeting with SpaceWire WG very positive, SOIS compliant protocols under preparation by SpaceWire WG Interaction with ECSS Milbus group underway CAN Bus planned for 2008 Problems and Issues Introduction of new signalling service requires name change of Time distribution Red Book – to Synchronisation service Prototyping delay Working Group Summary Situation: status:OKCAUTIONPROBLEM comment: Pending prototyping SOIS AREA REPORT

7 7 09 October 2007 7 3.Plug and Play BOF Goal: Develop SOIS plug and Play capability Working Group Summary progress: Definition of “SOIS Device Plug-and-Play” agreed: “SOIS Device Plug-and- Play is the set of automated mechanisms used to discover, learn the capabilities of, and provide access to a device in a spacecraft’s onboard (sub-)network.” Use cases developed ( FDIR, rapid spacecraft assembly, integration and test, BioNet) and tested against straw man architecture Plan of work established for remaining SOIS Red books Problems and Issues BOF Now has clear plan of work, do we create ‘high profile’ working group or absorb work into existing working groups? Working Group Summary Situation: status:OKCAUTIONPROBLEM comment: Pending prototyping SOIS AREA REPORT

8 8 09 October 2007 8 4.Wireless BOF Goal: CCSDS focus group for wireless technologies. Make recommendations pursuant to standardization of applicable wireless network protocols Working Group Summary progress: Consensus gained in 3 areas of work: Inventory control Intra-vehicle Assembly, Integration, and Test Draft charter prepared for working group Problems and Issues (Heads up) Wireless for Planetary surface currently not covered Working Group Summary Situation: status:OKCAUTIONPROBLEM comment: SOIS AREA REPORT

9 9 09 October 2007 9 D. Cross Area Issues SOIS requires a calibration service to support access to sensors. This was previous highlighted and an understanding reached that MOIMS would cover the topic. It is understood that MOIMS have not yet started the work so the agreement needs to be reviewed in terms of schedule and who does what – action assigned SOIS AREA REPORT

10 10 09 October 2007 10 E. OTHER ISSUES AND CONCERNS None SOIS AREA REPORT

11 11 09 October 2007 11 F. RESOLUTIONS FROM THIS MEETING 1. Propose SOIS Plug and Play BOF to become either a stand alone WG or for the work to be incorporated into SOIS Application services WG 2. Propose Wireless BOF to become WG 3. Propose Max Ciccone as Application service Deputy WG chair SOIS AREA REPORT

12 12 09 October 2007 12 Back-up slide – Wireless WG Wireless categories: Intra-vehicle: Internal vehicle (or habitat) extremely short-range wireless links and networking (up to 10 m range) Inter-vehicle: Vehicle-to-vehicle short-range and medium range (up to 20 km) Planetary surface-to-surface wireless links and networking (up to several kilometers). - EVA (Extra-Vehicular Activity) local links with planetary rover vehicles (RV) and/or habitats; - RV-habitat links when RV is close to habitat; - Links between independent local systems (e.g., habitats, robots, external assets) Orbiter relay-to-planetary surface links and networking SOIS AREA REPORT

13 13 09 October 2007 13 Back-up slide – Wireless WG SOIS AREA REPORT Overview of current deliverables - Draft Green Book containing rational, design-drivers, Wireless categories, approach etc - Intra-vehicle: Summarize scenarios, requirements, and suggested wireless protocols requirements for asset/inventory tracking and control via wireless communications in a Magenta Book; - Intra-vehicle: Summarize scenarios, requirements, and suggested wireless protocols requirements for intra-vehicle communications (e.g., a spacecraft or habitat), other than inventory management, in a Magenta Book; - Assembly-Integration-Test: Summarize scenarios, requirements, and suggested wireless protocols requirements for terrestrial assembly- integration-test (AIT) activities in a Magenta Book;


Download ppt "1 09 October 2007 1 SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor."