COPS NOVEMBER 2012 UPDATE TO TAC 11/29/2012 Harika Basaran, Chair Tony Marsh, Vice Chair.

Similar presentations


Presentation on theme: "COPS NOVEMBER 2012 UPDATE TO TAC 11/29/2012 Harika Basaran, Chair Tony Marsh, Vice Chair."— Presentation transcript:

1 COPS NOVEMBER 2012 UPDATE TO TAC 11/29/2012 Harika Basaran, Chair Tony Marsh, Vice Chair

2 2 COPS MAJOR DISCUSSION ITEMS ERCOT’s proposal-Method for Paying Small Amounts: Applies only to Default, Late Fee, and Misc Invoices. If the amount due to MP is < $50, money will be deposited to the Pre-pay account. MP can request wire of the funds in prepay account any time via e-mail to ERCOT Credit. COPS agreed to ERCOT’s proposal. MPs must e-mail ERCOT each time when they have an amount less than $50 if they want the money to be wired. Default action by ERCOT will be to put the amount in the Prepay Account. ERCOT will set up prepay account for each entity if they don’t have already. Daily ACL report has the balance of the prepay account.

3 3 NPRR 377 Alternate Inputs to Base Point deviation Charge This NPRR aligns the Adjusted Aggregated Base Point (AABP) formula with the inputs to the Generation Resource Energy Deployment Performance (GREDP) measure. The current formula for AABP inaccurately assesses Base Point Deviation Charges for under and over generation when shortened Security-Constrained Economic Dispatch (SCED) intervals occur. The GREDP inputs are linearly ramped 5 minute data points as follows: AVGBP5M – Base Point instruction AVGREGUP5M, AVGREGDN5M, AVGREG5M – Regulation Instructions1 AVGTG5M – Telemetered Generation Current design is to include the 5 minute data for the above listed billing determinants in the existing Market Input Header and Market Input Interval tables. Number of columns will increase from 100 to 300. Some MPs concern is that too much data pushed in one table which may slow down data queries/uploads. COPS voted NO on this item so that ERCOT will NOT include 5 minute data in the extracts for now. CSWG discussed and agreed to sponsor an SCR for ERCOT to create a new extract that will include 5 minute data only.

4 4 Workshop: Reducing the RTM Settlement Time Line: PUCT meeting on 9/28/2012 Agenda Item # 16, Project No: 40000 Commission Proceeding to Ensure Resource Adequacy in Texas. Commissioner Anderson discussed benefits of reducing the settlement time line to 3 days. COPS workshop on November 6, 2012 was well attended by many diverse stakeholders. Materials from that workshop can be found at: http://www.ercot.com/calendar/2012/11/20121106-OTHER James Galvin, Chair of CSWG, will provide more detailed slides next.

5 5 VOTING ITEM Tony Marsh from MAMO Enterprises (IPM Segment) was elected as Vice Chair –Need vote of TAC to confirm

6 6 UPCOMING LPGRR047 Automatic Yearly Update of Annual Validation Usage WindowLPGRR047 LPGRR048 Synchronization with NPRR454, Removal of Unfunded Project List Language, and Modification of Administrative LPGRR DefinitionLPGRR048 LPGRR049 Include AMS ESI IDs in the Annual Validation ProcessLPGRR049 NEXT COPS MEETING IS ON DECEMBER 14 FRIDAY, 2012 NEXT CSWG MEETING WILL ALSO BE HELD AT THE SAME TIME WITH COPS MEETING ABOVE


Download ppt "COPS NOVEMBER 2012 UPDATE TO TAC 11/29/2012 Harika Basaran, Chair Tony Marsh, Vice Chair."