Presentation is loading. Please wait.

Presentation is loading. Please wait.

Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012.

Similar presentations


Presentation on theme: "Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012."— Presentation transcript:

1 Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012

2 Roll 2 NameOrganizationRepresentation Nick VanDuyneNYeC State Ivan HandlerIL John DonnellyNJTask Group Co-Chair - IWG Marty PrahlSSA Federal agency Dennis Peterson, Curtus Browning, Elaine Hunolt, Taimur Aslam, Willie Singletary, Monica VanDykeVHA Kevin BradyNIST David Tao, Dan HuberSiemens EHR Vendor Dave Cassel, Rob KlootwykEpic Bill Howard, Charles ParisotGE Jeff Cunningham, Tim DunningtonICA HIE vendor Mike LaRoccaIntersystems Vladi Reznikov, Jennifer PuyenbroekCONNECT PMO Matt Bell, Tom Wilson, Kathy LinAxolotl Teddy GedamuMedfx Melissa OwensMarshfield ClinicHealth System Steve LeightyMedVirginia Regional HIE Brian Bonnington, Dave Trepanier, Dave Smith, Steve MichaelIHIE Anuj DesaiInterop WG Eric HeflinTHSATask Group Co-Chair - Exchange Mariann YeagerExchange Ed O'Connor, Judith HutmanNitorONC Testing Contractor Dennis Wilson, Alisa Ray, Sue Rieber CCHIT ATCBs and Testing SMEs Jim St. Clair IHE USA Amit Trivedi, Kevin Brown, Michella Knighton ICSA Labs Traci Mapps SLI Global Solutions Kyle Meadors, Timothy Bennett Drummond Group Milton Padilla, Steve Wilson, Mark Shin, Doublas Biggs, Les Biggs InfoGuard

3 Roll Call – Cayla Announcements – John Pilot Status - Eric Pilot Support – Judith / Ed Direct harmonization recap – Judith / Joe Test execution status – Judith soapUI demo – David Open Discussion – All Wrap Up/Schedule Review - John Agenda 3

4 Harmonized PD/QD/RD/MP/AF (aka Patient Record Lookup) Tests Were Ratified Last Week http://exchange-iwg.wikispaces.com/Test+Artifacts+Harmonization Pilot processes to be conducted in Sept CTB RFP Focused discussions with respondents for test tool clarifications Evaluations and contract discussions are still under way Announcements 4

5 Today (Wed 2012/8/29) we released process documents for the pilot Documentation includes Test Process Guide Testing Toolkit User’s Guide Test Execution Guide: PD-QD-RD Test Execution Guide: Messaging Platform & Authorization Framework Also we’ve created a pilot charter document Harmonized PRL (PD/QD/RD/MP/AF) Pilot Status 5

6 The pilot has been defined as having two distinct phases Current phase which is to review and prepare Next phase which is to engage with the CTB and execute the pilot proper Several organizations are moving forward We need your help! IWG and Exchange members Vendors Others Harmonized PRL Pilot Status (continued) 6

7 Intro to pilot Purpose Scope Approach and the “Ask” Pilot Charter Document Review 7

8 ONC Test Team Update Pilot Support Direct Harmonization Recap Test Execution Status soapUI Demo 8

9 Pilot Support

10 Artifacts Delivered Documentation Test Process Guide Testing Toolkit User’s Guide Test Execution Guide: PD-QD-RD Test Execution Guide: Messaging Platform & Authorization Framework Test Scripts soapUI scripts for high priority test cases

11 Direct Harmonization: Recap

12 Test Approach: Direct only v. Internal actors Direct Messaging Internal Actor Messaging

13 Internal Actor Testing Direct Messaging FR-2 SMTP Sender to HISP FR-3 HISP to SMTP Receiver FR-5 HISP Sender to HISP Receiver FR-7 SMTP to SMTP

14 Modular Approach Sample Analysis: Edge Protocol EHR-HIE Test Spec FR-2

15 FR-2: SMTP Sender to HISP * Internal actors specified * Send XDR not proscribed in Direct specs

16 FR-2: Applying a Modular Approach Direct Messaging DM1 DM2 DM3 Cert Discovery CD 1 CD 2 CD 3 EHR-HIE Applicant  Production Participant Deplmnt A Reqts FR 2 A2 A3 Event-Based Interop Testing DM1 DM2 CD 1 CD 2 FR 2 A2 Deplmnt B Reqts B1 B2 B3 DM3 CD 3 A3 Deplmnt X Reqts X1 X2 X3 XD Conversion XD 1 XD 2 XD 3 FR-2 SMTP to HISP FR-2 SMTP to HISP

17 Modular Approach Sample Analysis: Normative EHR-HIE Test Spec FR-5

18 FR-5: HISP Sender to HISP Receiver via S/MIME

19 FR-5: Applying a Modular Approach Direct Messagi ng DM1 DM2 DM3 Cert Discove ry CD 1 CD 2 CD 3 EHR-HIE Applicant  Production Participant Deplmnt A Reqts FR 1 A2 A3 Event-Based Interop Testing DM1 DM2 CD 1 CD 2 FR 1 A2 Deplmnt B Reqts B1 B2 B3 DM3 CD 3 A3 Deplmnt X Reqts X1 X2 X3 XD Convers ion XD 1 XD 2 XD 3 FR-5 Sending HISP to Receiving HISP FR-5 Sending HISP to Receiving HISP

20 Test Execution Status

21 Automating Test Case Execution: soapUI scripts complete PriorityHighMedLowX (untargeted) TOTALS PD89414 QD19150234 RD87112 M+A11516 Direct18 TOTALS54315 17107 NEW

22 soapUI Demo

23 Open Discussion

24 RFP released — July 2nd Questions received by 6 organizations Answers distributed — July 13th Bids due — July 20th Evaluating Expected award — Early Sept Contract start — TBD Schedule Review 24 We are here (running late)


Download ppt "Joint Exchange / Interop Work Group Test Workgroup John Donnelly/Eric Heflin/Judith Hutman Aug 29, 2012."

Similar presentations


Ads by Google