CLIC C&S WG meeting, 24-Feb-2011, B. Daudin 1CLIC C&S WG, 24-Feb-2011.

Similar presentations


Presentation on theme: "CLIC C&S WG meeting, 24-Feb-2011, B. Daudin 1CLIC C&S WG, 24-Feb-2011."— Presentation transcript:

1 CLIC C&S WG meeting, 24-Feb-2011, B. Daudin 1CLIC C&S WG, 24-Feb-2011

2  UI modifications : PBS details and estimates in one tab  New informative fields in PBS details: « Comments » and « Unit »  Crosstab: ◦ Default configuration ◦ Reduce refresh time and possibility to force refresh (3-4 minutes)  Calculations ◦ Escalation is no longer used in calculations executed from PBS tree ◦ Uncertainty calculation has been modified according to:  Performance improvement  Excel upload/download  Migration to WebLogic (new Web Application server) 2CLIC C&S WG, 24-Feb-2011

3 Facilitate data edition :  « APT like » Excel format  Format (sheet names, column order,…) has to be « readable » by the tool: Always use a file coming from the download 3CLIC C&S WG, 24-Feb-2011

4 4

5 5

6  Reference Data : 2 additional sheets containing codes, field description… 6CLIC C&S WG, 24-Feb-2011

7 Download the whole structure or only a subpart of the tree Warning: A big structure such as CLIC planning (~ 6000 PBS nodes ) requires time to be downloaded (~ 30 sec.) 7CLIC C&S WG, 24-Feb-2011

8 8

9 Copy a sub-part of CLIC 500 GeV to an empty planning: https://pptevm.cern.ch/costing/gwt [\\cernhomeB.cern.ch\B\BDAUDIN\Public\costing] 9CLIC C&S WG, 24-Feb-2011