Download presentation
Presentation is loading. Please wait.
Published byCornelia Henry Modified over 8 years ago
1
CLIC C&S WG meeting, 24-Feb-2011, B. Daudin 1CLIC C&S WG, 24-Feb-2011
2
UI modifications : PBS details and estimates in one tab New informative fields in PBS details: « Comments » and « Unit » Crosstab: ◦ Default configuration ◦ Reduce refresh time and possibility to force refresh (3-4 minutes) Calculations ◦ Escalation is no longer used in calculations executed from PBS tree ◦ Uncertainty calculation has been modified according to: Performance improvement Excel upload/download Migration to WebLogic (new Web Application server) 2CLIC C&S WG, 24-Feb-2011
3
Facilitate data edition : « APT like » Excel format Format (sheet names, column order,…) has to be « readable » by the tool: Always use a file coming from the download 3CLIC C&S WG, 24-Feb-2011
4
4
5
5
6
Reference Data : 2 additional sheets containing codes, field description… 6CLIC C&S WG, 24-Feb-2011
7
Download the whole structure or only a subpart of the tree Warning: A big structure such as CLIC planning (~ 6000 PBS nodes ) requires time to be downloaded (~ 30 sec.) 7CLIC C&S WG, 24-Feb-2011
8
8
9
Copy a sub-part of CLIC 500 GeV to an empty planning: https://pptevm.cern.ch/costing/gwt [\\cernhomeB.cern.ch\B\BDAUDIN\Public\costing] 9CLIC C&S WG, 24-Feb-2011
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.