MICE MICO Alain Blondel 23 December 2008 1 MICE Commissioning needs 22 December 08
2
MICE MICO Alain Blondel 23 December 2008 2 Status -- decay solenoid is cold, will be baby-sited cold during shut down -- first priority locally -- please write regular report of status -- TOF0, TOF1, BLM in good shape installed commissioned -- GVA2 GVA3 removed -- GVA1 will stay until FNAL BLM provides equiv. Services reliably -- target has to be removed from ISIS and inspected -- integration of DAQ to be completed -- “MICE Console project” (TJR: where do we stand?) -- inventory of electrical equipment to be performed ==> Steve Griffith -- Entrance to Hall: sign up sheet on the way from MLCR. -- +many little things which will be listed -- improve documentation (Shift checklist, shifters guide etc…)
3
MICE MICO Alain Blondel 23 December 2008 3 Keys keys keys Life of MOM is very much padlocked! Keys to Mice Control room are to be stored/obtained from ISIS control room, Keys to hall and DSA as well At present the padlocks of the beam dump ‘safety stop’ are not useful.
4
MICE MICO Alain Blondel 23 December 2008 4 Contact lists ‘no MICE equipment should be left unattended’ As clearly demonstrated with the target problems this week-end we must improve the contact list to make sure that each MICE sub-component has a single point of contact that always responds! ==> review the MICE contact list.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.