Download presentation
Presentation is loading. Please wait.
Published byIsabella Phelps Modified over 8 years ago
1
CLEARLY WE KNOW HOW TO BURY LARGE STRUCTURES. DRILLING AND BURYNG ALONG THE SAME ROUTE AS THE “POLES” SHOWS IT CAN BE DONE !!
7
DPS: “It should be noted that undergrounding offers lower storm damage costs and lower preventative maintenance cost when compared with overhead construction”.
14
CONTINUED INVESTMENT IN THE SAME OVERHEAD TRANSMISTION LINES WILL GIVE THE SAME RESULTS SUCH AS CUTTING TREES DOWN – MASSIVE OUTAGES – AND LOTS OF $$$$ REPAIR BILLS.
15
SEE WHAT OTHER STATES ARE DOING. UTILITIES WORK TOGEAHTER TO BURY http://www.NoMorePoles.com DPS: “It should be noted that undergrounding offers lower storm damage costs and lower preventative maintenance cost when compared with overhead construction”.
16
http://www.lipower.org/newscenter/pr/2015/013015-rate.html Enhance the tree trimming and vegetation management process. PSEG Long Island will continue work to improve grid resiliency by implementing vegetation work specification and technology changes to achieve an industry best-practice program.
18
WE CAN BE GREAT ONCE AGAIN AND BE A DESIRABLE PLACE TO LIVE AND WORK www.NoMorePoles.com
19
WE CAN BE GREAT ONCE AGAIN AND BE A DESIRABLE PLACE TO LIVE AND WORK MAKE OUR NATION PROUD BURY THE LINES.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.