Download presentation
Presentation is loading. Please wait.
Published byEzra Wheeler Modified over 9 years ago
1
Cameron Kergaye & David Stevens Utah DOT
2
Overview of UDOT Process July: UDOT leaders select about 12 people to attend the TRB Annual Meeting. November: Recent attendees share their implementation progress with the UDOT Leadership Team and the newly selected attendees. January: Each attendee brings back at least two innovative or cost-saving ideas to implement at UDOT. February: January attendees attend the UDOT Leadership Team meeting to describe their implementation ideas. Research Division periodically requests brief updates regarding implementation and actual cost savings.
3
Example of UDOT Implementation Rob Clayton, Traffic Management Division, 2012 TRB Real-Time Traffic Signal Performance Metrics Implemented with Purdue Univ. & Indiana DOT Cost-effective solution that measures vehicle delay, speeds & travel times Identified operational deficiencies & areas where mobility can be optimized 7% increase in vehicles arriving at a green signal on Foothill Boulevard in Salt Lake City Est. millions of dollars in user costs saved statewide
4
Collaboration with State DOTs Proposed collaboration within RAC Region 4 Also coordinate with the CCTF Share ideas from the TRB Annual Meeting Work together on implementation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.