Presentation is loading. Please wait.

Presentation is loading. Please wait.

Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010.

Similar presentations


Presentation on theme: "Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010."— Presentation transcript:

1 Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010

2 © Det Norske Veritas AS. All rights reserved. Barents 2020 Phase 4 - Working group RN02 03 August 2010 2 Barents 2020 Phase 4 – Working Group 2 Members Russian teamNorwegian/OGP team Marat N. Mansurov, VNIIGAZ, Coordinator Marina M. Karulina, Krylov Shipbuilding Res. Inst Irina A. Surikova, Russian Maritime Register of Shipping, TK 318 Sergei D. Kim, VNIIGAZ Pavel Liferov, Shtokman Development AG Nina Krupina, Arctic and Antarctic Res. Inst. Yury Nemenko, Giprospetsgaz Vakhtang M. Glonti, Gazprom S.I Zibakin, Gazprom Shelf Production Gleb Churkin, Agency of researches of industrial risks (observer) Valery P. Nekrasov, Ministry of Emergency Measures of the Russian Federation (observer) Vladimir A. Pestryaev, Sakhlinnipimorneft Rod Allan, Transocean Arne Gürtner, Statoil Hans Martin Sand, Moss Maritime Jean-Marc Cholley, Total/OGP Graham Thomas, BP/OGP Mike Orr, Cairn Energy/OGP Guido Kuiper, Shell/OGP DNV: Per Olav Moslet, Lars Ingolf Eide, Coordinator Invited experts ??

3 © Det Norske Veritas AS. All rights reserved. Barents 2020 Phase 4 - Working group RN02 03 August 2010 3 Objective and scope of RN02 work in Phase 4  Objective: Provide guidance and recommendations for design of stationary floating installations in the Barents Sea against ice loads, to fill the gaps identified in the 2010 edition of the coming ISO 19906 Standard.  Scope of work: - Task 1 – Workshop on ISO 19900-series, with emphasis on ISO19906. Objective: To harmonize understanding between Russian and Norwegian engineers with respect to reliability and probabilistic vs. deterministic design. - Task 2 – Develop Guidance for design of stationary floating structures against ice loads. Objective: Develop a Guidance Document that may serve as a common Russian-Norwegian Supplement to ISO19906 for use in the Barents Sea that fills identified gaps in ISO19906 with respect to ice loads against and the response of stationary floating structures. The Guidance will be based on state-of-the-art. Preparation of a detailed and final Scope of Work for this task can only be made after the working group has been formally established with Russian and Norwegian experts.

4 © Det Norske Veritas AS. All rights reserved. Barents 2020 Phase 4 - Working group RN02 03 August 2010 4 Key issues and challenges  Finalize scope to focus on the right topics  Obtain sufficient commitment from group members  Find the optimal “mode of operation”  Produce a useful deliverable

5 © Det Norske Veritas AS. All rights reserved. Barents 2020 Phase 4 - Working group RN02 03 August 2010 5 Decisions to be made at kick-off  Decide details of Scope and Work Plan for 2010  Decide on workshop on ISO19906  Outline of Work Plan for 2011  Decide how we will work  Distribute assignments  Degree of involvement and choice of external verifiers

6 © Det Norske Veritas AS. All rights reserved. Barents 2020 Phase 4 - Working group RN02 03 August 2010 6 Safeguarding life, property and the environment www.dnv.com ISBN 92-9169-122-4


Download ppt "Lars Ingolf Eide 03 August 2010 Barents 2020 Phase 4 - Working group RN02 Kick-off meeting Moscow August 24 - 25, 2010."

Similar presentations


Ads by Google