Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June 2009 1 Arkadiusz Chlopik.

Similar presentations


Presentation on theme: "The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June 2009 1 Arkadiusz Chlopik."— Presentation transcript:

1 The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June 2009 1 Arkadiusz Chlopik Turin, June 15, 2009

2 Andrzej Soltan Institute for Nuclear Studies 2 Arkadiusz Chlopik Turin, June 15, 2009 AGENDA AGENDA AGENDA Statistics Comments on Database What’s next?

3 DATABASE STATISTICS Andrzej Soltan Institute for Nuclear Studies 3 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE STATISTICS 12 subdetector groups 22143 total channels 22139 monitored channels 10028 controlled channels 17946 continuous channels 4112 discrete channels 85 Boolean channels 10 parameters (low voltage, high voltage, temperature, current, humidity, flow, pressure, power, coolant level, concentration)

4 DATABASE STATISTICS Andrzej Soltan Institute for Nuclear Studies 4 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE STATISTICS Update rates (in Hertz): 0,0028, 0,016, 0,032, 0,1, 0,2, 0,5, 1, 2 4078 interlocked channels

5 DATABASE STATISTICS Andrzej Soltan Institute for Nuclear Studies 5 Arkadiusz Chlopik Turin, June 15, 2009 SUBDETECTORS STATISTICS DATABASE STATISTICS SUBDETECTORCHANNELSMONITOREDCONTROLLEDINTERLOCKEDPARAMETERS Solenoid Magnet5044 43LV, HV, I, T, P, Flow, Pressure Dipole Magnet11 11T, I, Flow, Pressure Endcap DIRC4482 4353128LV, HV, T, Flow, Humidity EMC Barrel7961 00LV, HV, I, T, Flow, Pressure, Humidity, Level EMC Forward3070 00LV, HV, I, T, Flow, Pressure, Humidity, Level EMC Backward520 00LV, HV, I, T, Flow, Pressure, Humidity, Level MVD2630 153050HV, I, T, Flow

6 Andrzej Soltan Institute for Nuclear Studies 6 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE STATISTICS SUBDETECTORS STATISTICS DATABASE STATISTICS SUBDETECTORCHANNELSMONITOREDCONTROLLEDINTERLOCKEDPARAMETERS Barell DIRC513 LV, I, Flow Forward RICH604 4000LV, HV, I,T, Flow TPC12 HV, I, Flow STT264 200LV, HV, Flow, Pressure GEM2009 19101905LV, HV, I, T, Flow, Pressure, Level, Concentration

7 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 7 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS No data from CJT, DAQ+Trigger and Pellet Target subgroups Incompleteness Incorrectness

8 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 8 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS INCOMPLETNESS Solenoid Magnet MVD Forward RICH GEM STT

9 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 9 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS SOLENOID MAGNET

10 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 10 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS MVD

11 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 11 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS FORWARD RICH

12 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 12 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS GEM

13 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 13 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS STT

14 DAYABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 14 Arkadiusz Chlopik Turin, June 15, 2009 INCORRECTNESS Alarm ranges (Endcap DIRC, Dipole Magnet, EMC Barrell, EMC Forward, etc.) Interlocks (GEM, STT, etc.) DATABASE COMMENTS

15 Andrzej Soltan Institute for Nuclear Studies 15 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS RANGES – DEFINITIONS

16 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 16 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS ALARM RANGES – ENDCAP DIRC

17 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 17 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS ALARM RANGES – DIPOLE MAGNET

18 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 18 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS ALARM RANGES – EMC BARELL

19 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 19 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS ALARM RANGES – EMC FORWARD

20 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 20 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS INTERLOCKS – GEM

21 DATABASE COMMENTS Andrzej Soltan Institute for Nuclear Studies 21 Arkadiusz Chlopik Turin, June 15, 2009 DATABASE COMMENTS INTERLOCKS – STT

22 WHAT’S NEXT? WHAT’S NEXT? Andrzej Soltan Institute for Nuclear Studies 22 Arkadiusz Chlopik Turin, June 15, 2009 WHAT’S NEXT? HARDWARE - devices - distances - data transmission - data acquisition SOFTWARE - drivers, handlers, OPCs, etc. – to collect them or to write them - the code (LabView, EPICS, MonAlisa, etc.) GOALS FOR THE NEAREST FUTURE (MY SUGGESTION) - choose people responsible for hardware and software, maybe something else - count the people!!! - discuss all aspects and define the tasks - divide the tasks between people - start the work


Download ppt "The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June 2009 1 Arkadiusz Chlopik."

Similar presentations


Ads by Google