Download presentation
Presentation is loading. Please wait.
Published byLetitia Griffin Modified over 9 years ago
1
André Augustinus 16 September 2002 Muon tracker URD summary or, what we understand from the URD
2
André Augustinus 16 September 2002DCS Workshop 2 Muon-Trk Overview Muon-Trk HVLV Chamb.PS Equipm. ‘CROCUS’ Environm. Temperature Humidity Atm. pressure VME crate Cooling plant detector Alignment Geometry
3
André Augustinus 16 September 2002DCS Workshop 3 Muon-Trk CAEN 3 crates Ethernet 444 channels UX PX High Voltage: Wiener 24 crates CANbus 288 channels UX PX LV power supply: Wiener HVLV chambersPS Muon-Trk CAEN CROCUS 20 crates
4
André Augustinus 16 September 2002DCS Workshop 4 Muon-Trk P Crate control: CANbus ? UX PX 1 crate Environment: ? UX PX VME Crate I/O Device H T Equipment ‘CROCUS’ Environment Temperature Humidity Atm. pressure CROCUS ? 20 crates VME crate
5
André Augustinus 16 September 2002DCS Workshop 5 Muon-Trk Alignment: UX PX RASNIK Ethernet ? Alignment Geometry Geometry and chamber position surveillance with RASNIK system What will be the interface with DCS, and what will be the use of the data from this system.
6
André Augustinus 16 September 2002DCS Workshop 6 Muon-Trk status High Voltage: CAEN SY1527 Solution available Low Voltage PS: Wiener Solution available (basic, work ongoing) Crate control: Wiener crate Solution available Any other? Crocus Need more information/requirements Environment Solution available Need more information/requirements Cooling Plant Common effort (ST/CV)? Detector No information, will become clearer when decisions are taken Alignment: RASNIK Need more information/requirements FEE No DCS data to/from FE Maybe for FE debugging
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.