Download presentation
Presentation is loading. Please wait.
Published byDylan Ferdinand Hood Modified over 9 years ago
1
AMC WITH M/S GEE PRICE DETAILS AND SCOPE
2
DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS 3 YEAR AMC CHARGES (A) YEARLY MAINTENANCE PRICE (B) = (A)/3 OFF SHOREON-SHORE EQUIVALENT TOTAL OFF SHOREON-SHORE EQUIVALENT TOTAL US$INR US$INR POWERGRID$504,474INR 26,870,406INR 50,215,697$168,158INR 8,956,802INR 16,738,566 APTRANSCO$521,737INR 27,789,920INR 51,934,082$173,912INR 9,263,307INR 17,311,361 TNEB$448,200INR 23,873,047INR 44,614,174$149,400INR 7,957,682INR 14,871,391 KPTCL$408,546INR 21,760,882INR 40,666,961$136,182INR 7,253,627INR 13,555,654 KSEB$445,166INR 23,711,453INR 44,312,177$148,389INR 7,903,818INR 14,770,726 UT OF PONDY$356,675INR 18,998,049INR 35,503,720$118,892INR 6,332,683INR 11,834,573 TOTAL$2,684,798INR 143,003,757INR 267,246,812$894,933INR 47,667,919INR 89,082,271 (RECOUPMENT NOT CONSIDERED)
3
DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS FEP SPARES LUMPSUM CHARGES STATE/ UTILITY US$ EQUIVALENT TOTAL INR POWERGRID$22,907INR 1,060,056 APTRANSCO$64,775INR 2,997,560 TNEB$63,943INR 2,959,058 KPTCL$33,281INR 1,540,128 KSEB$42,700INR 1,976,007 UT OF PONDY$33,281INR 1,540,128 TOTAL$260,887INR 12,072,937
4
DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS ANNUAL MAINTENANCE PRICE (A) RECOUPMENT CHARGES (B) FEP SPARES PRICES ( C) TOTAL (A)+(B)+(C ) OFF SHOREON-SHORE EQUIVALENT TOTALOFF SHORE ON-SHORE EQUIVALENT TOTAL US$INR EQUIVALENT TOTAL US$INR US$INR US$INR POWERGRID$504,474INR 26,870,406INR 50,215,697$50,447INR 2,687,041INR 5,021,570$22,907INR 1,060,056$577,828INR 29,557,447INR 56,297,323 APTRANSCO$521,737INR 27,789,920INR 51,934,082$52,174INR 2,778,992INR 5,193,408$64,775INR 2,997,560$638,686INR 30,568,912INR 60,125,051 TNEB$448,200INR 23,873,047INR 44,614,174$44,820INR 2,387,305INR 4,461,417$63,943INR 2,959,058$556,963INR 26,260,352INR 52,034,650 KPTCL$408,546INR 21,760,882INR 40,666,961$40,855INR 2,176,088INR 4,066,696$33,281INR 1,540,128$482,682INR 23,936,970INR 46,273,785 KSEB$445,166INR 23,711,453INR 44,312,177$44,517INR 2,371,145INR 4,431,218$42,700INR 1,976,007$532,383INR 26,082,598INR 50,719,402 UT OF PONDY$356,675INR 18,998,049INR 35,503,720$35,668INR 1,899,805INR 3,550,372$33,281INR 1,540,128$425,624INR 20,897,854INR 40,594,220 TOTAL$2,684,798INR 143,003,757INR 267,246,812$268,479INR 14,300,376INR 26,724,681$260,887INR 12,072,937$3,214,164INR 157,304,133INR 306,044,430
5
AMC CONTRACT SCOPE The Scope of work includes: Comprehensive maintenance support both for Software and Hardware of SCADA/EMS system installed under SR ULDC scheme covering all control centers in SR (Sub-LDCs, SLDCs, RLDC). Deployment of trained engineers at SRLDC and all SLDCs (one engineer at each location) 24x7 support for all critical faults within 30 minutes Service level agreement at assured availability (penalty in case assured availability is not maintained) Well defined preventive maintenance schedule.
6
PROBLEM SEVERITY LEVELS
7
EMERGENCY SUPPORT RESPONSE TIMES
8
RESPONSIBILITY MATRIX
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.