Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ministry of New and Renewable Energy Government of India 1 11th January, 2016.

Similar presentations


Presentation on theme: "Ministry of New and Renewable Energy Government of India 1 11th January, 2016."— Presentation transcript:

1 Ministry of New and Renewable Energy Government of India 1 11th January, 2016

2

3 Sr. No. State/UT Total Cumulative capacity upto 31-12-15 (MW) Capacity addition during 2015-16 (upto 31-12-15) MW Total Expected commissioning during 2015-16(MW) 1Andhra Pradesh 357.34114.48 529 2Arunachal Pradesh 0.2650.24 0 3Chhattisgarh 73.1865.58 65 4Gujarat 1024.1524.1 0 5Haryana 12.80 0 6Jharkhand 160 0 7Karnataka 104.2227 100 8Kerala 12.02512 0 9Madhya Pradesh 678.58120 432 10Maharashtra 378.717.95 0 11Orissa 66.9235.16 25 12Punjab 200.3215.05 229

4 Sr. No. State/UT Total Cumulative capacity upto 31-12-15 (MW) Capacity addition during 2015-16 (upto 31-12-15) MW Total Expected commission during 2015-16 (MW) 13Rajasthan 1264.35322.25 330 14Tamil Nadu 418.945276.365 500 15Telangana 91.4530.2 900 16Tripura 50 0 17Uttar Pradesh 14068.74 70 18Uttarakhand 50 30 19West Bengal 7.210 0 20 Andaman & Nicobar 5.10 0 21Delhi 6.7121.247 0 22Lakshadweep 0.750 0 23Puducherry 0.0250 0 24Chandigarh 5.0410.541 0 25Daman & Diu 44 10 26Others 0.79 - - TOTAL 4878.8731134.903 3220

5 Tendering Status of Grid Connected Solar Power Projects during 2015-16

6 S.NoOrganisationScheme Tender issued and awarded (LOI issued) Tender issued but not awarded Tender likely to be issued 1SECIVGF Scheme 1190 MW (UP-440, MH-500, Gujarat-250 ) 2250 MW (AP-1250 Karnataka-500 MH-500) 2SECIAs a consultant23 MW310 MW90 MW Canal BankTop64 MW 36 MW 3NTPC Ltd Bundling scheme 2750 MW 250 MW (AP) 4NTPC LtdOwn/EPC250 MW1260 MW 1800 MW (Karnataka-1000, Gujarat-700, A&K-100 ) Total273 MW5574 MW4426 MW

7 S.NoStatesTender issued and awarded (LOI issued) Tender issued but not awarded Tender likely to be issued 1Punjab500 MW 2Karnataka300 MW1200 MW 3Madhya Pradesh300 MW 4Telangana600 MW1400 MW 5Haryana150 MW 6Uttar Pradesh215 MW 7 Uttrakhand181 MW 8 Andhra Pradesh500 MW 9 Tamil Nadu (Preferential traiff ) 1280 MW 10Jharkhand1200 MW 11Bihar150 MW Total3376 MW4450 MW150 Grand Total3649 MW10024 MW4576 MW

8 Summary S.No. Tendering by Tender issued and awarded (LOI issued) Tender issued but not awarded Tender likely to be issued 1SECI / VGF 1190 MW 2250 MW 2SECI / As a Consultant/Canal bank 23 MW310 MW90 MW 64 MW 36 MW 3NTPC Ltd / Bundling 2750 MW250 MW 4NTPC Ltd / Own Projects 250 MW1260 MW1800 MW 5State Scheme 3376 MW4450 MW150 Total 3649 MW10024 MW4576 MW Grand Total 18249 MW

9 Target of commissioning of Solar Projects during 2016-17 : 12000 MW This target will be reviewed in next PRAGAT To achieve this target, MNRE has set a target to award the work order for 18,025 MW by 31st March 2016

10 S.No.Organisation/StatesTarget 1NTPC Ltd ( through developer)3000 MW 2NTPC Ltd (EPC/Ownership)3310 MW 3SECI- VGF Scheme3250 MW 4SECI – Others( including other PSUs like CIL)500 MW States 5Punjab500 MW 6Karnataka1500 MW 7Madhya Pradesh300 MW 8Telangana2000 MW 9Haryana150 MW 10Uttar Pradesh215 MW 11Uttarakhand170 MW 12Andhra Pradesh500 MW 13Tamil Nadu1280 MW 14Bihar150 MW 15Jharkhand1200 MW Total18,025MW

11 S.No.Organisation/StatesExpected commissioning ( MW) 1NTPC Ltd ( Developer+ EPC)2500 2SECI (VGF+ As a consultant)3000 States 3Punjab500 4Karnataka1000 5Madhya Pradesh300 6Telangana2000 7Haryana150 8Uttar Pradesh223 9Uttarakhand191 10Andhra Pradesh200 11Tamil Nadu700 12Bihar150 13Jharkhand200 14Rooftop ( Under all scheme)900 Total12014

12

13  Approved 29 solar parks in 21 States  Aggregate capacity: 18,679 MW  CFA released to SECI: Rs. 382.36 Crore  General Issue: All State Governments to submit commitment in writing for purchase of at least 20% power generated from the solar park.

14 Sl. No. StateCapacity (MW) Name of the Solar Power Parks Developer (SPPD) 1.Andhra Pradesh1500 AP Solar Power Corporation Pvt. Ltd., JVC of SECI, APGENCO and NREDCAP 2.Andhra Pradesh1000 3.Andhra Pradesh1000 4.A&N Islands100NTPC 5.Arunachal Pradesh100 Arunachal Pradesh Energy Development Agency (APEDA) 6.Assam69 JVC of APDCL, APGCL & SECI 7.Chhattisgarh500CREDA 8.Gujarat700GPCL

15 Sl. No. State Capacity (MW) Name of the Solar Power Parks Developer (SPPD) 9. Himachal Pradesh 1000 HP State Electricity Board Ltd. 10. Jammu & Kashmir 100To be finalized 11.Karnataka2000 Karnataka Solar Power Development Corporation Pvt. Ltd. (KSPDCL); JVC of SECI and KREDAL. 12.Kerala200JVC of SECI and KSEB 13. Madhya Pradesh 750 Rewa Ultra Mega Solar Limited; a JVC of SECI and MPUVNL 14. Madhya Pradesh 2000 Rewa Ultra Mega Solar Limited; a JVC of SECI and MPUVNL 15Maharashtra500M/s Pragat Akshay Urja Ltd 16.Maharashtra500 Maharashtra State Electricity Generating Company Ltd. (MAHAGENCO) 17.Maharashtra500M/s K. P. Power Pvt. Ltd

16 Sl. No. StateCapacity (MW) Name of the Solar Power Parks Developer (SPPD) 18.Meghalaya20 Meghalaya Power Generation Corporation Ltd (MePGCL) 19.Nagaland60 Directorate of New & Renewable Energy, Nagaland 20.Odisha1000 JVC of GEDCOL & SECI 21.Rajasthan680 Rajasthan Solar Park Development Company Ltd. (RSDCL), a subsidiary of RRECL 22.Rajasthan1000 Surya Urja Company of Rajasthan Ltd; a JVC between State Govt. and IL & FS Energy Development Company Ltd 23.Rajasthan750M/s Essel Surya Urja Company of Rajasthan Limited; JVof GoR and Essel Infraprojects Limited

17 Sl. No. StateCapacity (MW) Name of the Solar Power Parks Developer (SPPD) 24.Rajasthan500 M/s Adani Renewable Energy Park Rajasthan Limited (AREPRL); a JVC of Government of Rajasthan and APEPRL. 25.Tamil Nadu500To be finalised 26.Telangana500 SECI, Telangana GENCO and Telangana New & Renewable Energy Development Corporation Ltd. (TNREDC) 27.Uttar Pradesh600 Lucknow Solar Power Development Corporation Ltd.; JVC of UPNEDA and SECI 28.Uttarakhand50 State Industrial Development Corporation Uttarakhand Limited (SIDCUL) 29.West Bengal500West Bengal State Electricity Distribution Company Ltd.

18 CFA Patter n 30% capital subsidy to farmers through SNA 40% through banks coupled with Loan Implemen ting Agencies State Nodal Agencies NABARD and other banks State Drinking Water Department

19 1,08,766 Solar Pumps Sanctioned Rs.353.50 Crore was released various agencies. 63,436 pumps sanctioned to States (Irrigation) 30,000 was sanctioned to NABARD 15,330 nos. sanctioned to States (Drinking Water.

20  Solar Pumps installed so far in the country : 37214  Sanctioned during 2014-15 : 1,08,766  Installed during 2015-16 ◦ For Irrigation: 14167 ◦ For Drinking water: 587 ◦ Through NABARD: 389 Total ____________________________ : 15143


Download ppt "Ministry of New and Renewable Energy Government of India 1 11th January, 2016."

Similar presentations


Ads by Google