Presentation is loading. Please wait.

Presentation is loading. Please wait.

Storyboard Day 3/3 E.Lyon 12.4.2015. Bell Work 12.4.2015 1)How was the sub last class? 2)Where you able to work on your storyboard with your group? 3)What.

Similar presentations


Presentation on theme: "Storyboard Day 3/3 E.Lyon 12.4.2015. Bell Work 12.4.2015 1)How was the sub last class? 2)Where you able to work on your storyboard with your group? 3)What."— Presentation transcript:

1 Storyboard Day 3/3 E.Lyon 12.4.2015

2 Bell Work 12.4.2015 1)How was the sub last class? 2)Where you able to work on your storyboard with your group? 3)What else do you need to ensure that you have a clear storyline for your film? 4)Write down as many shot styles as you can think or(if you can’t think of the name draw a picture to show it).

3 Agenda 12.4.2015 ▪ Bell Work ▪ Agenda ▪ Shot styles(new!) ▪ Film Expectations ▪ Storyboard time to create! ▪ No exit pass, it’s Friday DUE ▪ Storyboards at the end of class ▪ Remember to film you must have everything in the expectations in your storyboard before you can film

4 Shot Styles to Cover today Deep Focus Dolly Zoom Sequence Shot Whip Pan Source: http://www.empireonline.com/movies/features/film-studies-101- camera-shots-styles/

5 Film 4 Expectations ▪ Film Needs to Include: – Beginning, Middle, and End…it needs to have a story to it, so your audience can follow along – At least 6 or more shot styles and angles – 8 or more different song ‘parts’ – Everyone in your group needs to be in the film – A title, credit to all the songs you used, and transitions when needed between clips

6 Productions ▪ Films! ▪ Snow Person Awards


Download ppt "Storyboard Day 3/3 E.Lyon 12.4.2015. Bell Work 12.4.2015 1)How was the sub last class? 2)Where you able to work on your storyboard with your group? 3)What."

Similar presentations


Ads by Google