Presentation is loading. Please wait.

Presentation is loading. Please wait.

FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.

Similar presentations


Presentation on theme: "FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy."— Presentation transcript:

1 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy McCauley University of California - Berkeley

2 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 2 UCB September 21, 2005 F1 Probe I&T Flow

3 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 3 UCB September 21, 2005 F1 Probe I&T Flow

4 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 4 UCB September 21, 2005 F1 Probe I&T Flow

5 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 5 UCB September 21, 2005 F1 Probe I&T Facility

6 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 6 UCB September 21, 2005 F1 Probe I&T Facility

7 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 7 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-010THEMIS Probe Power On ProcedureModifySAI-1526 thm-mint-proc-011THEMIS Probe Power Off ProcedureModifySAI-1526 thm-mint-proc-012THEMIS Bus CPT ProcedureModifySAI-XXX thm-mint-proc-013THEMIS Bus LPT ProcedureModifySAI-1527 thm-mint-proc-014THEMIS Bus AT ProcedureModifySAI-XXX thm-mint-proc-015THEMIS Probe Loading and Unloading ProcedureModifySAI-1377 thm-mint-proc-016THEMIS Probe EMC/EMI SignaturesDraftIn Progress thm-mint-proc-017THEMIS Probe Self CompatibilityModifySYS-009 thm-mint-proc-020THEMIS Instrument Harness InstallationDraftIn Progress thm-mint-proc-021THEMIS IDPU/ESA Mechanical Integration ProcedureInitial RevReleased thm-mint-proc-022THEMIS SST Mechanical Integration ProcedureDraftReleased thm-mint-proc-023THEMIS SPB Instrument Mechanical Integration Procedure Initial RevReleased thm-mint-proc-024THEMIS FGM Sensor Mechanical Integration Procedure DraftReleased thm-mint-proc-025THEMIS SCM Sensor Mechanical Integration Procedure DraftReleased F1 Probe I&T Documentation

8 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 8 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-026THEMIS Mag Boom Mechanical Integration and Alignment # Assigned thm-mint-proc-027THEMIS Mag Boom Mechanical Clearance Verification# Assigned thm-mint-proc-028THEMIS IDPU Electrical Integration ProcedureModifySAI-1563 thm-mint-proc-029THEMIS Particles Electrical Integration TestInitial RevReleased thm-mint-proc-030THEMIS Fields Electrical Integration TestInitial RevReleased thm-mint-proc-031THEMIS Deployment Verification TestDraftReleased thm-mint-proc-032THEMIS Instrument CPT ProcedureModifySYS-005 thm-mint-proc-033THEMIS Instrument LPT ProcedureModifySYS-006 thm-mint-proc-034THEMIS Instrument AT ProcedureModifySYS-007 thm-mint-proc-035THEMIS Closed Loop ACS Test Procedure# Assigned thm-mint-proc-036THEMIS SST Connector Plate Alignment ProcedureDraftReleased thm-mint-proc-038THEMIS Mag Boom Restow Procedure# Assigned thm-mint-proc-039THEMIS Instrument Closeout Procedure# Assigned thm-mint-proc-120THEMIS Facility and MGSE Magnetic Test ProceduresDraftReleased thm-mint-proc-121THEMIS Component Magnetic Test ProcedureDraftIn Progress F1 Probe I&T Documentation

9 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 9 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-122THEMIS ESA/SST Purge Hookup ProcedureInitial RevReleased thm-mint-proc-040THEMIS Probe ESC Test Procedures# Assigned thm-mint-proc-041THEMIS Probe EMC Test Procedure# Assigned thm-mint-proc-042THEMIS Probe Magnetics Test Procedure# Assigned thm-mint-proc-043THEMIS Probe Vibration Test ProcedureDraftReleased thm-mint-proc-044THEMIS Probe Pair Vibration Test Procedure# Assigned thm-mint-proc-045THEMIS Probe Vibration Test Electrical Configuration# Assigned thm-mint-proc-046THEMIS Probe TV Test Procedure# Assigned thm-mint-proc-047THEMIS Probe Pair TV Test Procedure# Assigned thm-mint-proc-048THEMIS Probe TV Functional# Assigned thm-mint-proc-049THEMIS Probe Spin Balance Procedure# Assigned thm-mint-proc-050THEMIS Probe CTV RF Compatibility Test Procedure# Assigned thm-mint-proc-051THEMIS Probe Fueling/Defueling Procedure# Assigned thm-mint-proc-052THEMIS Probe Pre-TV Closeout Procedure# Assigned thm-mint-proc-053THEMIS Probe Pre-Launch Closeout Procedure# Assigned thm-mint-proc-054THEMIS Probe Battery Ops Procedure# Assigned F1 Probe I&T Documentation

10 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 10 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-055THEMIS Probe RCS Pressure Test and Leak Check# Assigned thm-mint-proc-056THEMIS Probe Rollover Procedure# Assigned thm-mint-proc-058THEMIS Probe Lift in Rollover Fixture Procedure# Assigned thm-mint-proc-059THEMIS Probe Thermal Vac Chamber Loading Procedure # Assigned thm-mint-proc-140THEMIS Probe Thermal Closeout Procedure# Assigned thm-mint-proc-060THEMIS PCA Vibration Test Procedure# Assigned thm-mint-proc-061THEMIS PCA Acoustics Test Procedure# Assigned thm-mint-proc-062THEMIS PCA LV Mate Procedure# Assigned thm-mint-proc-063THEMIS PCA LV Electrical Test Procedure# Assigned thm-mint-proc-064THEMIS PCA Pre Encapsulation Closeout Proc# Assigned thm-mint-proc-065THEMIS PCA Launch Tower Electrical Test Procedure# Assigned thm-mint-proc-066THEMIS PCA Pre Launch Closeout Proc# Assigned thm-mint-proc-067THEMIS PCA Spin Balance Procedure# Assigned thm-mint-proc-080THEMIS Probe End-to-End with MOC/SOCDraftIn Progress thm-mint-proc-081THEMIS Launch & Early Orbit Simulations# Assigned F1 Probe I&T Documentation

11 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 11 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures thm-mint-proc-082THEMIS Contingency Procedures# Assigned thm-mint-proc-083THEMIS UCB Ground Station RF System Sensitivity Test DraftIn Progress Mission Integration and Test Procedures - Swales Documents SAI-PROC-13731373-Probe Assembly Procedure SAI-PROC-14041404-Side Solar Array Installation Procedure SAI-PROC-14171417-BAU and Transponder Mechanical Installation SAI-PROC-14181418-Sun Sensor Mechanical Installation SAI-PROC-14211421-Battery Mechanical Installation Procedure SAI-PROC-14271427-BAU Electrical Integration Procedure SAI-PROC-14281428-IRU Electrical Integration Procedure SAI-PROC-14291429-MSSS Electrical Integration Procedure SAI-PROC-14301430-AEB Electrical Integration Procedure SAI-PROC-14311431-S/A Electrical Integration Procedure SAI-PROC-14321432-Battery Electrical Integration Procedure SAI-PROC-14331433-RCS Electrical Integration Procedure F1 Probe I&T Documentation

12 FM1 Instrument Suite Pre-Ship Review (PSR)INT- 12 UCB September 21, 2005 Doc NumberDescriptionRevStatus Mission Integration and Test Procedures - Swales Documents SAI-PROC-14351435-Transponder/Antenna Electrical Integration Procedure SAI-PROC-14611461-Electrical Test Set (ETS) Inspectrion and Functional Test SAI-PROC-13771377-Probe Ground Lifting and Handling Procedure SAI-PROC-13511351-PCA Assembly Procedure SAI-PROC-13981398-Sep System Installation Procedure SAI-PROC-14341434-Probe Carrier Electrical Integration Procedure SAI-PROC-14061406-PCA Lifting and Handling Procedure SAI-PROC-XXXProbe Container Lifting Procedure SAI-PROC-XXXDelivery Inspection of SA Panels SAI-PROC-XXXP1 ETU BAU Removal and Flight BAU Installation SAI-PROC-XXXS/A Mechanical Integration Procedure F1 Probe I&T Documentation


Download ppt "FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy."

Similar presentations


Ads by Google