Download presentation
Presentation is loading. Please wait.
Published byCecil Hawkins Modified over 8 years ago
1
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015
2
2 SVT Progress Module production complete, reception test done, test stand and fixtures received Cooling system commissioned, flow meters installed SVT Test Stand assembled for R1-R4 SVT Region 1 modules installed, surveyed, tested, burned in Region 2 disassembled Region 2 assembly started SVT Region 4 cold plate and support tube in fabrication Integration tooling (SVT R1-3/4 and MVT) analysis done, documented, and the report is being reviewed Integration tooling drawings made, first round of review completed, feedback provided to designer Service cart analysis done and is being documented Service cart drawings made, first round of review completed, feedback provided to designer Cosmic data taking in progress Chiller EPICS software developed SVT detector web page created in Clas12Docs using Sphinx
3
3 SVT Test and Assembly setup in EEL 124 R3 R2-3 SVT R1-2 R1-3 R4 R3 UPS Cosmic stand R2 ring R3 ring
4
4 R2 installation R2 ring
5
5 EPICS SVT Control and Monitoring
6
6 SVT Monitoring: Region 1 Hybrid Temperature
7
7 SVT Monitoring: Region 1 Leakage Currents
8
8 SVT Cosmic Data taking
9
9 SVT Web page in Clas12Docs http://clasweb.jlab.org/clas12offline/docs/detectors/html/svt/introduction.html
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.