Problem No. 5 Problem No. 5 p.38 A 100’ 1000’ FILL ROADWAY 1.0’ Dry clay fill 100% density Use table p. 37 5 minutes for calculation Volume to be trucked.

Similar presentations


Presentation on theme: "Problem No. 5 Problem No. 5 p.38 A 100’ 1000’ FILL ROADWAY 1.0’ Dry clay fill 100% density Use table p. 37 5 minutes for calculation Volume to be trucked."— Presentation transcript:

1

2

3 Problem No. 5 Problem No. 5 p.38 A 100’ 1000’ FILL ROADWAY 1.0’ Dry clay fill 100% density Use table p. 37 5 minutes for calculation Volume to be trucked in SCY?

4 Problem No. 5 - Solution Problem No. 5 p.38 A 100’ 1000’ FILL 1.0’ Fill Volume = (1,000’ x 100’) ÷ 27 = 3,704 CY SCY = 3,704 x 1.35 ÷ 0.9 = 5556 Trucked CY ROADWAY

5 Problem No. 5 Problem No. 5 p.38 100’ 1000’ FILL 1.0’ 800’ into project Already used up 5556 cy Checked math Checked formula Checked tables What happened? 800’200’ ROADWAY

6 Problem No. 5 Possible Reasons for shortage: Soil is different Material is wetter than when first calculated Over – compacted Ground loss

7 ABOUT the INSTITUTE Courses and Seminars for the Construction Industry Founded in 1982 For over 20 years and over 30,000 taught Provides “On-Site” Training Home/Office Study Programs Using New Technology including QUEST©


Download ppt "Problem No. 5 Problem No. 5 p.38 A 100’ 1000’ FILL ROADWAY 1.0’ Dry clay fill 100% density Use table p. 37 5 minutes for calculation Volume to be trucked."

Similar presentations


Ads by Google