1 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Steve Lathrop, PacifiCorp Panel#2: A Day in the Life of Planners/Engineers 2008 PI T&D Users Group Meeting, Atlanta, Sept 10-12
2
2 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Agenda Area Planning at PacifiCorp Infrastructure Planning Load Duration Curves – a New View of Data Non-SCADA Asset Loads SCADA Accuracy
3
3 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Area Planning Substation, sub-transmission and non-Main Grid transmission infrastructure Future Infrastructure needs (long-range planning) Daily Operations Issues Asset load analysis Load projections Capital spending Risk-Management data
4
4 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Area Planning Watch Lists
5
5 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Area Planning Watch Lists
6
6 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Area Planning Watch Lists
7
7 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load / Voltage Analysis Alphabet soup: –Real-time –Historical –Projected –Peak –Instantaneous –Average –Changing ….the differentiator between these is…Time
8
8 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning Area Coincident Loads –Six transformers serve this area Can I accurately determine area peak load and growth?
9
9 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning Area Coincident Loads—Load profiles for the six:
10
10 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning Area Coincident Loads—Projected loads
11
11 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning Area Coincident Loads—Add all loads coincidentally
12
12 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning Area Coincident Loads— Projected growth of area load
13
13 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning
14
14 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning
15
15 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Infrastructure Planning Load Projections –Multiple Load Duration Tool v1.1
16
16 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load Duration Curves Time-Series data converted to time-independent data –Simplifies analysis –Non-engineers understand it
17
17 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load Duration Curves Demonstrate peak loads, duration of peaks and how many hours load limits are exceeded
18
18 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load Duration Curves Rearrange data: load-dependent, not time-dependent
19
19 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load Duration Curves
20
20 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load Duration Curves
21
21 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Load Duration Curves
22
22 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Non-SCADA Asset Loads Substation C has no electronic metering. Can I get load profile data for it? –My Power Flow suggests 1 MW losses total for line sections 1-4 at peak load SCADA CIS Source
23
23 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Non-SCADA Asset Loads Substation C load is approximated by: Sub C = Sub A – Sub B – Sub D – 1 MW SCADA CIS ~ Source
24
24 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Non-SCADA Asset Loads Black trace is my ‘pseudo-SCADA’ load profile
25
25 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Verify SCADA Accuracy Transformer appeared to be overloaded 20-MVA loading guideline 105% loading
26
26 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Verify SCADA Accuracy
27
27 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Verify SCADA Accuracy ‘Problem’ surfaced Error ‘Tag’ built Transducer Change-out Error goes to zero
28
28 © 2008 OSIsoft, Inc. – All Rights Reserved PI T&D Users Group Verify SCADA Accuracy Questions? Steve.Lathrop@PacifiCorp.com