Download presentation
Presentation is loading. Please wait.
Published byBenjamin Day Modified over 9 years ago
1
US Army Corps of Engineers BUILDING STRONG ® N ational D redging Q uality M anagement ( DQM ) P rogram PIANC USA, DREDGING 2012 SAN DIEGO, CA 24 OCTOBER 2012 Vern Gwin, Program Director National DQM Center
2
BUILDING STRONG ® National Dredging Quality Management (DQM) Program V2.5 Release Database Updates New On-Board software Dynamic Web Site Cutterhead PDT Mechanical Demo New in 2012
3
BUILDING STRONG ®
5
DQM CONSOLE
6
BUILDING STRONG ®
12
CUSTOMIZED DATA EXPORT
13
BUILDING STRONG ®
14
MULTI-LOAD DISPOSAL PLOTS
15
BUILDING STRONG ®
18
DQM On-Board Software (DQMOBS)
19
BUILDING STRONG ® New DQM Dynamic Website http://dqm.usace.army.mil/
20
BUILDING STRONG ® Cutterhead PDT Agenda May 2012 Purpose: HQ has directed DQM with implementing the monitoring of cutterhead pipeline dredges. The purpose of this initial PDT meeting is to formalize an implementation plan. Discuss the details of monitoring which include data, data transmission, specifications, pilot projects, contractor coordination, etc. DQM Overview Review Past Evaluations ► Illinois – Folly Beach, SC ► Goetz – Fountain City, WI Review Surveys - Data Parameters Discuss Draft Specification Future Evaluations (PDT Discussion) Implementation Plan
21
BUILDING STRONG ® Standardized Environmental Protection Agency (EPA) Reporting
22
BUILDING STRONG ®
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.