15.057 Spring 02 Vande Vate 1 1 Modeling Service When Transport is restricted to Load-Driven Pool Points in Retail Distribution John Vande Vate Spring 2007
2
15.057 Spring 02 Vande Vate 2 2 Retail Inventory Single “Product”, many SKUs Style Color Size Broad Offering attracts customers Depth in SKU avoids missed sales Stock enough in each SKU to cover replenishment time (OTD)
3
15.057 Spring 02 Vande Vate 3 3 Service Requirement Keep OTD short Reduce depth without losing sales Increase breadth to attract more customers and expand market OTD requirements differ by store –Manhattan, NY –Manhattan, KS
4
15.057 Spring 02 Vande Vate 4 4 What’s in OTD POS system records sale Transmitted to DC Orders batched for efficient picking Order picked Trailer filled (Load driven) Line Haul to Pool Point Delivery
5
15.057 Spring 02 Vande Vate 5 5 Pool Points Asian Port US Port Pool Store Asian Factory US DC
6
15.057 Spring 02 Vande Vate 6 6 Pools Influence Trailer Fill –The greater the volume to the pool the faster the trailer fills Line Haul –Is determined by the distance from the DC to the Pool Delivery –Messier
7
15.057 Spring 02 Vande Vate 7 7 The Trade-offs Too Few Pools –High Delivery Costs –More moving inventory –Less waiting inventory Too Many Pools –Low Delivery Costs –Less moving inventory –More waiting inventory
8
OTD Dissected POS system records sale Transmitted to DC Orders batched for efficient picking Order picked Trailer filled (Load driven) Line Haul Delivery Constant cost & time Cost & Time depend on Pool Assignment
9
15.057 Spring 02 Vande Vate 9 9 Line Haul Time & Cost Depend on –The Pool Assignment –Which DC’s serve the Pool NY DC to Chicago Pool LA DC to Chicago Pool
10
15.057 Spring 02 Vande Vate 10 10 Trailer Fill Time Depends on –The Pool Assignments Which pool this store is assigned to What other stores are assigned to this pool Rate at which the Pool draws goods –How the Pool is served The Rate at which the Pool draws goods from each DC
11
15.057 Spring 02 Vande Vate 11 11 Drilling Down on Service Simple Model –Cube only (trailers never reach weight limit) –One DC only (don’t split volumes to Pool) Many DC’s –Cube only Weight & Cube and Many DC’s Soft Constraints: –Infeasible is not an acceptable answer
12
15.057 Spring 02 Vande Vate 12 12 Toward a Simple Model Trailer Fill Time (for store) * Rate Trailer Fills = Cubic Capacity of the Trailer Rate Trailer Fills –Translate annual demand at stores assigned to the pool into cubic feet per day –Rate to pool is: sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool]
13
15.057 Spring 02 Vande Vate 13 13 Make It Linear Trailer Fill Time * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool] = Cubic Capacity of the Trailer Trailer Fill Time * Assign What to do?
14
15.057 Spring 02 Vande Vate 14 14 Can’t Know Trailer Fill Time Trailer Fill Time * Rate Trailer Fills = Cubic Capacity of the Trailer Max Time to Fill Trailer * Rate Trailer Fills ? Cubic Capacity of the Trailer Why Cubic Capacity of the Trailer? What does this accomplish?
15
What’s Wrong? Max Time to Fill Trailer to store * Rate Trailer Fills Cubic Capacity of the Trailer Max Time to Fill Trailer* (sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool]) Cubic Capacity of the Trailer What if the Store is not assigned to the Pool?! Max Time to Fill Trailer * Rate Trailer Fills Cubic Capacity of the Trailer*Assign[store,pool]
16
15.057 Spring 02 Vande Vate 16 16 Our Simple Model var Assign{STORES, POOLS} binary; Service Constraint for each store and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool] >= Cubic Capacity of the Trailer*Assign[store, pool] Max Time to Fill Trailer depends on the Store and the Pool: Store Service Requirement, e.g., 3 days Constant Order time, e.g., order processing, picking, etc. Line haul time from DC to Pool Delivery time from Pool to Store
17
15.057 Spring 02 Vande Vate 17 17 Getting Practical There are scores of Pools and THOUSANDS of Stores That means hundreds of thousands of service constraints! Can we just impose them at the Pools? If the Pools open… –Ensure we get there in reasonable time (same time from there to all stores) –May have to handle a few special stores separately
18
15.057 Spring 02 Vande Vate 18 18 A Simpler Model var Assign{STORES, POOLS} binary; Service Constraint for each pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool] >= Cubic Capacity of the Trailer*Assign[store, pool] var Open{POOLS} binary; Assign[store, pool] Open[pool] Max Time to Fill Trailer depends on the Store and the Pool: Store Service Requirement, e.g., 3 days Constant Order time, e.g., order processing, picking, etc. Line haul time from DC to Pool Delivery time from Pool to Store (depends on pool)
19
15.057 Spring 02 Vande Vate 19 19 One DC Cube Only Model var Assign{STORES, POOLS} binary; Service Constraint for each pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool] >= Cubic Capacity of the Trailer*Assign[store, pool] var Open{POOLS} binary; Max Time to Fill Trailer depends on the Pool: Store Service Requirement, e.g., 3 days Constant Order time, e.g., order processing, picking, etc. Line haul time from DC to Pool Delivery time from Pool to Store (depends on pool)
20
15.057 Spring 02 Vande Vate 20 20 More than One DC Service Constraint for each pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Demand[prd,s]*Assign[s, pool] >= Cubic Capacity of the Trailer*Open[pool] What’s wrong with this?
21
15.057 Spring 02 Vande Vate 21 21 The Problem If the pool is served by several DC’s, trailers fill more slowly The “rate” from each DC is less than the total rate of demand at the pool.
22
15.057 Spring 02 Vande Vate 22 22 How to Get the Rates How fast does the trailer for pool fill at dc? Not the rate of demand at the pool The rate of shipments from the dc to the pool Translate shipments Ship[*, dc, pool]
23
15.057 Spring 02 Vande Vate 23 23 What’s Wrong Now Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer*Open[pool]
24
15.057 Spring 02 Vande Vate 24 24 The Problem Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer*Open[pool] Does the DC serve the Pool? These constraints insist the service is good from EVERY dc to EVERY open pool.
25
15.057 Spring 02 Vande Vate 25 25 Fixing the Problem var UseEdge{DCS, POOLS} binary; Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer* UseEdge [dc, pool] Define UseEdge for each prd, dc and pool: Ship[prd, dc, pool] <= sum{s in STORES (that can be assigned to the pool)} Demand[prd,s]* UseEdge[dc, pool]
26
15.057 Spring 02 Vande Vate 26 26 Several DCs Cube Only var UseEdge{DCS, POOLS} binary; Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer* UseEdge [dc, pool] Define UseEdge for each prd, dc and pool: Ship[prd, dc, pool] <= sum{s in STORES (that can be assigned to the pool)} Demand[prd,s]* UseEdge[dc, pool]
27
15.057 Spring 02 Vande Vate 27 27 Weight & Cube var UseEdge{DCS, POOLS} binary; Cube Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer*UseEdge[dc, pool] Weight Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} Weight[prd]/DaysPerYear*Ship[prd, dc, pool] >= Weight Limit of the Trailer*UseEdge[dc, pool]
28
15.057 Spring 02 Vande Vate 28 28 What’s Wrong Now? var UseEdge{DCS, POOLS} binary; Cube Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer*UseEdge[dc, pool] Weight Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} Weight[prd]/DaysPerYear*Ship[prd, dc, pool] >= Weight Limit of the Trailer*UseEdge[dc, pool]
29
15.057 Spring 02 Vande Vate 29 29 Weight AND Cube Trailer departs when –Weight Limit is reached OR –Cubic Capacity is reached Don’t have to fill BOTH
30
15.057 Spring 02 Vande Vate 30 30 How to Fix It? The Cubic Capacity Constraint Applies If –We use the edge from the dc to the pool: UseEdge[dc, pool] = 1 AND –We Cube Out that trailer first: New Variable CubeOut[dc,pool] = 1 How to capture this? (UseEdge[dc,pool] + CubeOut[dc,pool] -1)
31
15.057 Spring 02 Vande Vate 31 31 How to Fix It? The Weight Limit Constraint Applies If –We use the edge from the dc to the pool: UseEdge[dc, pool] = 1 AND –We DO NOT Cube Out that trailer first: CubeOut[dc,pool] = 0 How to capture this? (UseEdge[dc,pool] - CubeOut[dc,pool])
32
A Full Model var UseEdge{DCS, POOLS} binary; var CubeOut{DCS, POOLS} binary; Cube Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer*(UseEdge[dc, pool]+ CubeOut[dc,pool]-1) Weight Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} Weight[prd]/DaysPerYear*Ship[prd, dc, pool] >= Weight Limit of the Trailer*(UseEdge[dc, pool]- CubeOut[dc,pool])
33
Cube or Weight How do we know which constraint should apply? ….. >= Cubic Capacity of the Trailer*(UseEdge[dc, pool]+ CubeOut[dc,pool]-1) or …. >= Weight Limit of the Trailer*(UseEdge[dc, pool]- CubeOut[dc,pool])
34
15.057 Spring 02 Vande Vate 34 34 What if it’s not feasible Infeasible is not a very helpful answer Want an answer that is “as close as possible” Sequential Optimization: –Minimize Service Failures –Minimize Cost subject to Best Achievable Service
35
15.057 Spring 02 Vande Vate 35 35 Service Failures Can’t express them in terms of time Express them in terms of Capacity How much of the trailer is left unfilled at the end of the available time?
36
Unfilled Capacity Max Time to Fill Trailer * Rate Trailer Fills Cubic Capacity of the Trailer*Binary Switch Scale this: Max Time to Fill Trailer * Rate Trailer Fills Cubic Capacity of Trailer Binary Switch (0 or 1) - Service Failure (fraction of trailer unfilled)
37
15.057 Spring 02 Vande Vate 37 37 Sequential Optimization First Objective: –Minimize the sum of the Service Failures –Could weight Service Failures Second Objective: –Minimize Cost –s.t. Service Failures <= Best Possible
38
The Whole Story var UseEdge{DCS, POOLS} binary; var CubeOut{DCS, POOLS} binary; var ServFail{POOLS} >= 0; Cube Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} CubicFt[prd]/DaysPerYear*Ship[prd, dc, pool] >= Cubic Capacity of the Trailer*(UseEdge[dc, pool]+ CubeOut[dc,pool]-1) - Cubic Capacity of the Trailer*ServFail[pool]; Weight Service Constraint for each dc and pool: Max Time to Fill Trailer * sum{prd in PRODUCTS, s in STORES} Weight[prd]/DaysPerYear*Ship[prd, dc, pool] >= Weight Limit of the Trailer*(UseEdge[dc, pool]- CubeOut[dc,pool]) - Weight Limit of the Trailer*ServFail[pool]