Download presentation
Presentation is loading. Please wait.
Published byAmelia Jordan Modified over 9 years ago
1
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT- A85A30) Life is back in our Tx board - Solved problems and changed all components as stated last week (replaced Rmod, lowered VCSEL…) - Soldered new Tx board - Result: good open eyes (conn VCSEL) Thanks to group 1 for spec sheet on unconnectorized VCSEL, tips on alignment tolerance testing on Tx board, and loaning us a Rx board Need to trade unconn VCSEL for conn PD (if interested see us) Progress: Continue Working on alignment tolerance testing on Tx board Focus on the final paper Next Week:
2
XYZ-Test of Rx Board with PD PDT-A85A30 Three Positions of Open eyes Best eye10-dots eye Z up by 0.72mm
3
Units: x10 microns Alignment Tolerance Testing for Rx with Unconnectorized PD, S7911 and PDT-A85A30 (Mapping Figures) Unconnectorized PD S7911 Unconnectorized PD PDT-A85A30
4
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November15-21, 2002) K28.5 PRBS7 Open eyes for Tx board
5
Alignment tolerance testing with Tx board
7
XYZ-Test of Rx Board with PD S7911 Capacitance= 0.45F Units: x10 microns
8
XYZ-Test of Rx Board with PD PDT-A85A30 Capacitance=1.2F Units: x10 microns
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.