ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-

Similar presentations


Presentation on theme: "ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-"— Presentation transcript:

1 ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT- A85A30) Life is back in our Tx board - Solved problems and changed all components as stated last week (replaced Rmod, lowered VCSEL…) - Soldered new Tx board - Result: good open eyes (conn VCSEL) Thanks to group 1 for spec sheet on unconnectorized VCSEL, tips on alignment tolerance testing on Tx board, and loaning us a Rx board Need to trade unconn VCSEL for conn PD (if interested see us) Progress: Continue Working on alignment tolerance testing on Tx board Focus on the final paper Next Week:

2 XYZ-Test of Rx Board with PD PDT-A85A30 Three Positions of Open eyes Best eye10-dots eye Z up by 0.72mm

3 Units: x10 microns Alignment Tolerance Testing for Rx with Unconnectorized PD, S7911 and PDT-A85A30 (Mapping Figures) Unconnectorized PD S7911 Unconnectorized PD PDT-A85A30

4 ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November15-21, 2002) K28.5 PRBS7 Open eyes for Tx board

5 Alignment tolerance testing with Tx board

6

7 XYZ-Test of Rx Board with PD S7911 Capacitance= 0.45F Units: x10 microns

8 XYZ-Test of Rx Board with PD PDT-A85A30 Capacitance=1.2F Units: x10 microns

9

10

11


Download ppt "ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-"