UMPP Projects: ISSUES. PFCCL Tilaiya UMPP  Procuring States have agreed to terminate PPA with Reliance Power Ltd. and during meeting held on 23.12.2015.

Similar presentations


Presentation on theme: "UMPP Projects: ISSUES. PFCCL Tilaiya UMPP  Procuring States have agreed to terminate PPA with Reliance Power Ltd. and during meeting held on 23.12.2015."— Presentation transcript:

1 UMPP Projects: ISSUES

2 PFCCL Tilaiya UMPP  Procuring States have agreed to terminate PPA with Reliance Power Ltd. and during meeting held on 23.12.2015 have decided to pay termination payment to takeover SPV  Project is proposed to be re-bid at the earliest.  The contribution may be remitted immediately by concerned states in proportionate to the Power allocation to the collection account of Jharkhand to enable takeover of SPV by last week of Jan’16 and bidding process can be initiated thereafter.

3 Minstry Of Power Bihar UMPP West Bengal has refused to take power (400 MW) allocated to it. States may intimate their requirement for power from the proposed UMPP and submit commitment advance.  Site: Situated in Kakwara in Banka District  Water : available from Ganga river  Coal : Pirpainti/Barahat coal block tentatively allocated for the project  Power Allocation State Tentative Power Allocation (In MW) 1 Bihar2000 2 Jharkhand1000 3 Uttar Pradesh600 4 West Bengal400 Requirement intimated by States 1 Gujarat1000 2 Karnataka500 3 UP600 4 Kerala250 5 Goa200

4 Ministry Of Power Deoghar UMPP State Requirement intimated by States (In MW) 1 Karnataka2000 2 Goa1000 3 Gujarat1000 4 Kerala400 5 Haryana200 States may intimate their requirement for power from the proposed UMPP and submit commitment advance.  Site: Situated in Husainabad in Deoghar District  Water: 80 MCM water available. Air Cooled Condenser Technology is being studied for required water.  Gomarpahari-Siuilbani coal block tentatively identified for the project  Power Allocation :-


Download ppt "UMPP Projects: ISSUES. PFCCL Tilaiya UMPP  Procuring States have agreed to terminate PPA with Reliance Power Ltd. and during meeting held on 23.12.2015."