04.04.2007 SB 1 Cables from PP to calorimeters Cabling being done by ITEP-Moscow and IAP-Bucarest team Summary for cables/connectors list, rack wizard by Robert
2
04.04.2007 SB 2 Cables routing PP -> fix point -> ECAL PP -> fix point -> HCAL HCAL -> fix point -> ECAL 380V + control for power supplies Power for CWs, pin-diods Data and TTC optical cables ECS SPECS Radioactive source for HCAL DSS Water Trigger cables
3
04.04.2007 SB 3
4
4 Optical cables few problems identified by Patrick: Trigger-Data fibers are not tagged Colour convention problem to test before installation ? Trigger cables HCAL -> ECAL length critical for 6 cables => individual routing Water cooling: water reservoir still to be produced Manpower “sharing” with other activities Some details
5
04.04.2007 SB 5 Minimal cabling for common test (ECAL L3B01 + HCAL L3A03) 380 V + control Data + trigger optical Trigger HCAL -> ECAL SPECS for CROCs, voltage and light distribution boards ECAL+HCAL Power CWs and LEDs (?), backup: keep power supplies on the calorimeter Turbines for two racks involved Connection of two chillers problem: guarding/monitoring the power for chillers and turbines Cabling for common test
6
04.04.2007 SB 6 C-side rack 1 for ECAL/PS and HCAL rack to be finished on the week of 9/10 (partial DSS, temporary water?) C-side to be completed on the week of 16/10 (partial DSS, temporary water?) A-side to start on the week of 16/10 Permanent labels pending Outlook