Download presentation
Presentation is loading. Please wait.
Published byIsabella Horton Modified over 9 years ago
1
WP1: DAUIN involvement Polito_DAUIN is involved in WP1 for 8,5 MMs Tasks: T1.1 Review of end-user requirements and application scenarios T1.5 Guidelines for R&M design practices, including DfE (Design for Environment) T1.1: Analysis of the state-of-the-art (hardware and software AR technologies) Identification of users requirements and use cases (in collaboration with WIRES) T1.5: Definition of guidelines for the implementation of the AR-based platform
2
WP1: DISAT involvement Polito_DISAT is involved in WP1 for 8 MMs Tasks: T1.1 Review of end-user requirements and application scenarios T1.2 Life data collection and analysis T1.4 Life-cycle costing prediction and assessment T1.5 Guidelines for R&M design practices, including DfE T1.1: Identification of users requirements (in collaboration with WIRES) T1.2: The use of diamond wires in stone cutting machines T1.4: Life-cycle costing prediction and assessment focusing on materials T1.5: Design for Environment (DfE) procedures focusing on materials
3
WP1: DIATI involvement Polito_DIATI is involved in WP1 for 7 MMs Tasks: T1.1 Review of end-user requirements and application scenarios T1.2 Life data collection and analysis T1.4 Life-cycle costing prediction and assessment T1.5 Guidelines for R&M design practices, including DfE T1.1: Analyzing stone materials in their interaction with the cutting system T1.2: Collecting the data during the stone cutting T1.4: Assessing operating conditions T1.5: Guidelines for the best use of the cutting system
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.