Presentation is loading. Please wait.

Presentation is loading. Please wait.

WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED

Similar presentations


Presentation on theme: "WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED"— Presentation transcript:

1 WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
SOUTHERN REGIONAL LOAD DESPATCH CENTRE WELCOMES CHAIRMAN & MEMBERS FROM KARNATAKA ELECTRICITY REGULATORY COMMISSION & DIRECTOR (TRANSMISSION) , KPTCL

2 PRESENTATION OVERVIEW
SOUTHERN REGIONAL GRID – QUICK FACTS SR GRID OPERATION – TYPICAL ISSUES IN PAST SR GRID – CARDINAL EVENTS SR GRID OPERATION – PRESENT STATUS PROJECTS IN PIPELINE – KARNATAKA & SR ISSUES OF INTEREST – FURTHER CHALLENGES/GOALS 400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

3 SOUTHERN REGIONAL GRID QUICK FACTS
400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

4 REGIONAL GRIDS INSTALLED CAPACITY TOTAL 115,569 MW
NORTHERN :- 31,230 MW EASTERN :- 17,697 MW SOUTHERN :- 31,931 MW WESTERN :- 32,354 MW NORTH-EASTERN :- 2,357 MW TOTAL ,569 MW NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION

5 SOUTHERN REGION WESTERNREGION EASTERN REGION NORTHERN REGION NORTH-EASTERN REGION ‘ ELECTRICAL’ REGIONS 1 2 3 TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQ SAME FREQUENCY FROM GUJARAT TO ARUNACHAL PRADESH WITH EFFECT FROM MARCH 2003 ABOUT 2800 KMS! APART

6 ‘ELECTRICAL’ REGIONS NORTHERN REGION 1 NORTH-EASTERN REGION EASTERN REGION WESTERNREGION 2 TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQ SOUTHERN REGION WITH THE COMMISSIONING OF THE TALA PROJECT CONNECTING THE EASTERN AND NORTHERN GRIDS, INDIA WILL HAVE ONLY TWO GRIDS

7 SOUTHERN REGION – GEOGRAPHY
ANDHRA PRADESH TAMIL NADU KARNATAKA KERALA POPULATION : CRORES ( 22% OF INDIA) AREA :- 651 (‘000 SQ KM)(19% OF INDIA) INSTALLED CAPACITY:- 31,931 MW(27.6%) WEATHER :- South-west monsoon North-east monsoon SEA COAST :- AROUND 4000 KM TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQ

8 SR STATES – POWER SYSTEM STATISTICS
KARNATAKA INSTALLED CAPACITY – 5802 MW MAX DEMAND MET – 5445 MW DAILY CONSUMPTION MAX – 107 MU DAILY CONSUMPTION AVG – 84 MU CONSUMER PROFILE – DOM INDU AGRI COMML OTHERS 37% % % % % . ANDHRA PRADESH INSTALLED CAPACITY – 9531 MW MAX DEMAND MET – 7441 MW DAILY CONSUMPTION MAX – 166 MU DAILY CONSUMPTION AVG – 130 MU CONSUMER PROFILE – DOM INDU AGRI COMML OTHERS 22% % % % % . TAMIL NADU INSTALLED CAPACITY – 7074 MW MAX DEMAND MET – 7228 MW DAILY CONSUMPTION MAX – 147 MU DAILY CONSUMPTION AVG – 126 MU CONSUMER PROFILE – DOM INDU AGRI COMML OTHERS 21% % % % % . KERALA INSTALLED CAPACITY – 2617 MW MAX DEMAND MET – 2426 MW DAILY CONSUMPTION MAX – 39 MU DAILY CONSUMPTION AVG – 34 MU CONSUMER PROFILE – DOM INDU AGRI COMML 76% % % %. TALA PROJECT-LARGE CENTRAL GRID ARUNACHAL TO GUJARAT ON SAME FREQ

9 GROWTH OF INSTALLED CAPACITY OF SR
IN MW Average Growth ~ 5 %

10 INSTALLED CAPACITY IN SR
STATES HYDRO THERMAL NUCLEAR DIESEL/GAS WIND OTHERS TOTAL % AP 3586 2993 272 2 6853 21% KAR 3166 1470 128 5 4769 15% KER 1808 235 2043 6% TN 1996 3570 423 19 6008 19% C.S 6990 830 360 8180 26% IPP 229 794 2432 245 377 4078 13% 10785 15817 3851 271 31931 34% 50% 3% 12% 1% The above capacity does not includes --- About 1344 MW of Wind Mill Capacity in Tamil Nadu. Micro and Captive plants in different states.

11 SOURCE-WISE INSTALLED CAPACITY OF SR
IN MW NUCLEAR OTHERS WIND HYDRO GAS THERMAL 31,931 MW

12 AGENCY-WISE INSTALLED CAPACITY OF SR
31,931 MW IN MW IPP ANDHRA PRADESH CENTRAL SECTOR KARNATAKA TAMIL NADU KERALA

13 TYPICAL LOAD CURVE OF SR
EVENING PEAK SUMMER WINTER MONSOON WEATHER RESERVOIR CONSUMPTION

14 LOAD COMPOSITION IN SOUTHERN GRID
Domestic Others Industry Commercial Agriculture

15 TYPICAL LOAD SPREAD IN SR
LOAD MW LOAD MW

16 SR GRID - HIGHLIGHTS WIDE SPREAD TRANSMISSION NETWORK
HIGHEST CAPACITY HVDC LINK IN COUNTRY GENERATING UNITS OF VARIED TYPE & CAPACITY 32 Nos. of 400 KV SUB-STATIONS 17600 MVA TRANSFORMATION CAPACITY INTER-REGIONAL LINKS WITH ALL NEIGHBOURING REGIONS

17 SR GRID TYPICAL ISSUES IN THE PAST
400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

18 "If a path to the better there be, it begins with a full look at the worst." -- Thomas Hardy

19 SR GRID OPERATION – TYPICAL ISSUES IN PAST
LOW FREQUENCY PROBLEMS FREQUENCY EXCURSES TO LOW VALUES LOW VOLTAGE OPERATION VOLTAGE AT EHV GRID LEVEL DIPPES TO CRITICALL LOW LEVELS SYSTEM BROWNOUTS / BLACK OUTS LOADS FREQUENTLY CUT OFF DUE TO RELAY OPERATION INCREASED ELECTRICAL LOSSES INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS ...THE END RESULT :

20 SR GRID OPERATION PRESENT STATUS
400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

21 GRID OPERATION – PRESENT STATUS
STABILISED SYSTEM FREQUENCY IMPROVED VOLTAGES MERIT ORDER OPERATION OPERATIONAL EXCELLENCE INTER REGIONAL EXCHANGES IMPROVED GRID SECURITY JAN - 02 JAN - 03 Vol 400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES FGMO

22 SR GRID CARDINAL EVENTS
400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

23 SR GRID -- CARDINAL EVENTS
AVAILABILITY BASED TARIFF UNIFIED LOAD DESPATCH SCHEME TALCHER-KOLAR HVDC LINK SPECIFIC ACTIONS BY SRLDC FINANCIAL DISCIPLINE SCHD DRWL ...THESE EVENTS CHANGED THE FACE OF GRID OPERATION

24 PROJECTS IN PIPELINE KARNATAKA & SR
400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

25 PROJECTS IN SOUTHERN REGION
400 KV MADURAI-TRIVANDRUM LINE 400 KV RAMAGUNDAM – HYDERABAD-RTPS-GOOTY-BANGALORE LINE ADDITIONAL 500 MW HVDC POLE AT GAZUWAKA SYSTEM AUGMENTATION PROJECTS 400 KV KHAMMAM-N’SAGAR LILO OF N’SAGAR-GOOTY AT KURNOOL NEW 400 KV SS IN TAMIL NADU ADDITIONAL 400 KV SS NEAR MADRAS 400 KV BACKBONE CORRIDOR IN KERALA KOODANKULAM EVACUATION SCHEME – 2000 MW CAPACITY

26 PROJECTS IN KARNATAKA 400 KV NELAMANGALA-MYSORE LINE WITH 400 KV SUBSTATION AT MYSORE 400 KV SUB STATION AT HIRIYUR 400 KV KAIGA-NARENDRA-KOLHAPUR LINK 400 KV SUB STATION AT NARENDRA 400 KV RING MAIN AROUND BANGALORE 400 KV 2nd GOOTY-BANGALORE LINK ADDITIONAL 400 KV EVACUATION LINK FOR RAICHUR THERMAL POWER PLANT

27 BANGALORE 400 KV RING MAIN KOLAR NELAMANGALA HOODY 400 KV RING MAIN
SOMANAHALLI

28 ISSUES OF INTEREST FURTHER CHALLENGES/GOALS
400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

29 FURTHER CHALLENGES/GOALS
INTRA-STATE ABT METERING AND BILLING HARNESSING UNUTILISED CAPACITY FACILITATING SHORT TERM OPEN ACCESS ENHANCING BANKING/WHEELING VIABILITY 400 MU CONS IN A DAY-1.5% IS 6 MU, 2190 MU IN A YEAR, 2/UNIT IS 4400 MILLION RUPEES IS 440 CRORE RUPEES

30

31 Voltage at Bangalore Jan 02 & 03

32 MONSOONS SOUTH WEST MONSOON NORTH EAST MONSOON

33 400 KV LINE PRESENTLY OPERATED AT 220 KV
GRID MAP TALCHER BHADRAVATI JEYPORE 178x2 2x221 SIMHADRI NTPC 8x4 RSTPP 400 KV LINE PRESENTLY OPERATED AT 220 KV 1 GAZUWAKA(AP) 189 301x2 P 15x2 187 195 267x2 VISAKHAPATNAM (POWERGRID) HYDERABAD KHAMMAM P 197x2 P 115 317 P MMDP 155 P 146x2 258 221x2 VIJAYAWADA RAICHUR P NAGARJUNASAGAR TYPICAL FLOWS ARE FROM NORTH TO SOUTH GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW Nagjhari 172 279 308 MUNIRABAD SSLMM KODASAALY P 277 KAIGA KURNOOL 52x2 N SIRSI 120 P GOOTY 60 CUDDAPAH DAVANAGERE P 300 302 173 NELLORE KADRA HIRIYUR 330 242 NELAMANGALA 28 BANGALORE ALMATHI HOODY P KOLAR MADRAS P TALGUPPA HOSUR MAPS 182 181 63 175 SALEM PONDICHERY P 54 179 NEYVELI 151 164x2 UDUMALPET 130x2 P TRICHY TRICHUR P P 127 130x2 P MADURAI ABOUT CKM 400KV TRANSMISSION PALLOM T.L.BREAKUP IS NEXT! EDAMON THIRNELVALI KAYANKULAM 2x78 THIRUVANATHAPURAM KOODANKULAM

34 TRANSMISSION IN SOUTHERN INDIA
VOLTAGE LEVEL AP KAR KER TN CGS TOTAL 400 KV 2042 1614 8462 12118 220/230 KV 10050 7590 2650 6270 366 26926 132/110 KV 12360 6060 3720 10220 32360 24452 15264 6370 16490 8828 71404 ABOUT 2800 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS

35 TALCHER KOLAR SCHEMATIC
Electrode Station Electrode Station KOLAR +/- 500 KV DC line 1370 KM Kolar 400kv System 220kv system Hosur Hoody B’lore Chintamani Salem Madras Cudappah Udumalpet

36 GENERATING UNITS IN SOUTHERN REGION
UNIT CAPACITY AP KAR KER TN CGS TOTAL THERMAL (500 MW) 2 7 9 THERMAL ( MW) 10 13 15 45 GAS/THERMAL ( MW) 3 24 HYDRO (>50 MW) 27 16 85 48 36 19 38 163 A.P TYPICAL GENERATOR SPREAD IN SR KAR - HYDRO - THERMAL KER TN GENERATORS ABOVE 1000 MW - GAS / NAPTHA GENERATORS 500 – 1000 MW - NUCLEAR GENERATORS BELOW 500 MW

37 GENERATING UNITS AND CAPACITY
UNIT CAPACITY AP KAR KER TN CGS TOTAL THERMAL(500 MW) 2 7 9 THERMAL ( MW) 10 13 15 45 GAS/THER( MW) 3 24 HYDRO(>50 MW) 27 16 85 48 36 19 38 163

38 400KV SUB-STATIONS IN SR 8 4 2 14 5 9 1 6 19 32 AP KAR KER TN
POWERGRID STATE OTHERS TOTAL AP 8 4 2 14 KAR 5 9 KER 1 TN 6 19 32 KALPAKKA RAMAGUNDAM 1 GAZUWAKA SIMHADRI P HYDERABAD KHAMMAM P P P MAMIDIPALLY P VIJAYAWADA RAICHUR P NAGARJUNASAGAR MUNIRABAD SRI SAILAM P KURNOOL P GOOTY CUDDAPAH 60 DAVANAGERE P NELLORE HIRIYUR NELAMANGALA TALAGUPPA BANGALORE P KOLAR HOODY MADRAS P -- OF POWERGRID HOSUR -- OF NTPC NEYVELI TPS I (EXP) 63 SALEM -- OF ANDHRA PRADESH P NEYVELI -- OF KARNATAKA UDUMALPET P TRICHY -- OF NLC TRICHUR P P P MADURAI

39 ICT SUMMARY IN SOUTHERN INDIA
VOLTAGE RATIO AP KAR KER TN CGS TOTAL 400/230 or 400/220 KV 7 2 5 29 50 400/132 or 400/110 KV --- 3 8 31 55

40 INTER REGIONAL LINKS ORISSA CSEB MAH A.P KAR T.N KER HVDC BI POLE
CHANDRAPUR TALCHAR ORISSA JEYPORE CSEB MAH BALIMELA RAMAGUNDAM BARSUR GAZUWAKA U.SILERU KOLHAPUR L.SILERU A.P BELGAUM AMBEWADI HVDC BI POLE HVDC B2B STATION GOA KAIGA CENTRAL GEN.STATION KAR 220 kV LINE 400 kV LINE KOLAR MAPS 110 kV HVDC LINE NEYVELI PONDICHERRY T.N KER POWERGRID SRLDC

41 Inter Regional Links Present IR Capacity = 9,000 MW 1650 MW 700 MW
2300 16,000 700 MW 32,700 MW 1200MW Present IR Capacity = 9,000 MW 30,500 MW 2000MW

42 INTER-REGIONAL TRANSFER BY END OF 11th PLAN (2012)
SOUTHERN REGION WESTERNREGION NORTHERN REGION NORTH-EASTERN REGION INTER-REGIONAL TRANSFER BY END OF 11th PLAN (2012) 13450 MW 1000 MW 6450 MW 4600 MW 1300 MW 3200 MW EASTERN REGION 30,000 MW OF INTER-REGIONAL POWER BY 2012

43 THE INDIA ELECTRICITY MARKET TIME LINE
LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY COMMITTMENT 1-5 YEARS SHORT TERM LOAD FORECAST DAY-AHEAD SCHEDULING WEEK TO DAY AHEAD REAL TIME 15 MT BLOCKS REAL-TIME SPOT/BALANCING MARKET

44 Components of inter-utility tariff (Pre – ABT Mechanism)
Fixed charges Interest on loans Depreciation O & M charges Return on equity Interest on Working Capital Energy charges (fuel cost) Incentives Surcharge & other levies No charge for reactive energy

45 Unscheduled Interchange (UI)
Payment to Inter State Generating Stations (ISGS) from beneficiaries under Availability Based Tariff (ABT) Capacity charges Energy charges Unscheduled Interchange (UI)

46

47 CAPACITY CHARGE Capacity charge will be related to ‘availability’ of the generating station and the percentage capacity allocated to the state. ‘Availability’ for this purpose means the readiness of the generating station to deliver ex-bus output expressed as a percentage of its rated ex-bus output capability.

48 ENERGY CHARGE Energy charges shall be worked out on the basis of a paise per kwh rate on ex-bus energy scheduled to be sent out from the generating station as per the following formula Energy charges = Rate of energy charges (paise/kwh) x Scheduled Generation (ex-bus MWh)

49 UNSCHEDULED INTERCHANGE (U I) :
Variation in actual generation / drawal with respect to scheduled generation / drawal shall be accounted for through Unscheduled Interchange (UI). UI for generating station shall be equal to its total actual generation minus its scheduled generation. UI for beneficiary shall be equal to its total actual drawal minus its total scheduled drawal.

50 UNSCHEDULED INTERCHANGE (U I) :
UI shall be worked out for each 15 minute time block. Charges for all UI transactions shall be based on average frequency of the time block. UI rates shall be frequency dependent and uniform throughout the country.

51 UI RATE Rate of Unscheduled Drawal/Injection Frequency (Hz) Rate (p/u)
Above 50.5 50.0 150 49.8 210 49.0 and below 570

52 AVAILABILITY BASED TARIFF
CAPACITY CHARGE ENERGY CHARGE ADJUSTMENT FOR DEVIATIONS (U I CHARGE) (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % allocation from the plant (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)

53 FEATURES : No complication regarding deemed generation.
(A) and (B) do not depend on actual plant generation / drawal. No metering required for this as they are based on off-line figures. All deviations taken care of by (C) No complication regarding deemed generation. Perpetual incentive for maximizing generation and reducing drawal during deficit, but no incentive to over generate during surplus.

54 STABILISED SYSTEM FREQUENCY
TYPICAL FREQUENCY CURVE SCATTER DIAGRAM HISTOGRAM OF FREQUENCY FREQUENCY DURATION CURVE Df/dT CURVE RECORD FVI OF 0.04

55 FREQUENCY PROFILE 2002, 2003 & 2004

56 2004 2003 2002 <49.0 49.0 & <49.5 49.5 & <50.5 50.5 & Above
<49.0 49.0 & <49.5 49.5 & <50.5 50.5 & Above Max Min Avg FVI St. Dev 2004 0.03 1.46 98.28 0.23 50.82 48.62 49.95 0.31 0.12 2003 0.17 8.32 90.66 0.85 50.85 48.60 49.81 0.95 0.18 2002 73.62 12.45 12.84 1.09 51.08 47.69 48.63 23.59 0.44 2004 2003 2002

57 COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY
2003 2004 BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES REALITY BITE: FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!. EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED! 2002

58 WATER SUPPLY TO BANGALORE
PUMPING LOSSES REDUCED ENORMOUS SAVINGS TO THE STATE MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED 400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID

59 CUM. INS. CAP. ABOUT 16000 MW OF CAPACITY IS BELOW 300 Ps

60 49.72 HZ

61 MERIT ORDER : UNITS BOXED UP
POWER STATION STATE CAPACITY(MW) FUEL VARIABLE COST TATA DIESEL KARNATAKA 79 DIESEL 308 RAYALSEEMA DGPP 27 360 YELEHANKA DIESEL 128 314 THANRBHAVI 220 NAPTHA 325 SUB-TOTAL 454 BRAHAMPURAM DPP KERALA 107 275 BSES 157 KASARGODE PCL 22 298 KAYAMKULAM 322 646 BASIN BRIDGE TAMIL NADU 120 584 P.P.NALLUR 330 415 450 TOTAL 1550

62

63 INTER – REGIONAL(01/01/03 TO 10/10/04)
(+) IMPORT / (-) EXPORT INTER REGIONAL UI (WR): MU – 211 MU INTER REGIONAL UI (ER): MU – 21 MU AVG RATE OF IMPORT FROM WR IN PS/U 134 PS/U @WR 247 PS/U @SR AVG RATE OF EXPORT TO WR IN PS/U 163 PS/U @SR 287 PS/U @WR AVG RATE OF IMPORT FROM ER IN PS/U 145 PS/U @ ER 212 PS/U @ SR

64 MAJOR AND MINOR DISTURBANCES SINCE 1994
SPS NO DISTURBANCES DESPITE LOSING ENTIRE SUPER GENERATING PLANTS LIKE RAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI, SHARAVATHY ETC

65 SHARP PEAK DEEP VALLEY DEEP VALLEY

66 KADAMPARAI PUMP OPERATION
SAVINGS OF RS 40 LAKHS EVERY DAY INVESTMENT OF 1600 CRORES SAVED GENERATOR MODE PUMP PUMP THE PUMP MODE WAS NOT UTILISED SINCE INCEPTION!!!

67 OPPORTUNISTIC UI TRADE
POWER EXPORT TO WR ON UI BASIS DURING LOAD CRASH FREQ

68 UI TRANSACTION ON 31/08/03 SUNDAY, GANESH CHATURTHI
HIGH FREQUENCY IN ER-WR GRID POWER IMPORTED AT CHEAP PRICE MUTUAL BENEFIT Total UI imported from C. Grid by SR:8.88 MU Max Power transfer in UI from C Grid:860 MW AMOUNT SAVED : Rs. 107 LAKH IN ONE DAY!

69 OPTIMAL RESERVOIR UTILISATION IDUKKI IN KERALA
KERALA SAVED RS 50 CRORES BY EFFICIENT UTILISATION OF THE RESERVOIRS AT IDUKKI! POWERGRIDs 400 KV MADURAI-TRIVANDRUM LINE WILL HELP KERALA SAVE EVEN MORE ENERGY IN THE COMING YEAR Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. 400 MU IS WORTH 800 MILLION RUPEES AT RS 2.00/UNIT WHICH IS 80CRORE RUPEES PLANT OPERATORS AT IDUKKI THINK OF THE RESERVOIR LEVEL IN RUPEES RATHER THAN IN FEET!!! Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.

70 FREQUENCY CURVE FOR 9th SEPTEMBER 2004
FVI = 0.04 Avg Freq = 49.99Hz 10 * ∑ (F – 50) 2 FVI = 24 * 60

71 SPECIFIC ACTION BY RLDC
LOSS REDUCTION TAP CO-ORDINATION FILTER CO-ORDINATION REDUCED LINE OPENING HVDC SET POINT CHANGES VAR MANAGEMENT REVIVAL OF DORMANT INTER-STATE LINES 100% DISBURSEMENT IN SETTLEMENT SYSTEM OPTIMISATION OF INTER-REGIONAL EXCHANGES MERIT ORDER OPERATION

72 Hierarchy of The ULDC Scheme in Southern Region
RLDC,Bangalore SCC, Pondy CPCC Hyderabad Kalamassery Chennai Bangalore Andhra Kerala Tamilnadu Karnataka Bangalore Hyderabad Kalam’erry Chennai Lingusugur Cuddapah Kannur Erode Warangal Trivandrum Madurai Hubli Vijayawada

73 EMS/SCADA Package … Contd
Sl No: Constituent RTUs supplied Existing RTUs integrated Control Centres 1.0 APTRANSCO 91 - 4 2.0 TNEB 40 35 3 3.0 KPTCL 22 21 4.0 KSEB 30 5.0 UT of Pondy 5 9 1 6.0 Central Sector 27 Total 215 65 15 RTUs Grand Total : 280

74 Karnataka Andhra Pradesh UT of Pondy Kerala Tamilnadu
Information Flow to Control Centres Ramagundam Karnataka Warangal Satellite Ghanapur HYDERABAD Vijayawada Andhra Pradesh Hubli Davangeree MW Link Chinkampalli Bangalore FO Link State owneed Link CHENNAI Sub-LDC SLDC Pondy Kannur-B Erode RCLDC UT of Pondy Kerala KALAMASSERY Tamilnadu Madurai Vydyuthi Bhavanam

75 Communication Channel for Information flow
RLDC Wide Band Commn (MW / FO) SLDC SLDC Wide Band Commn Sub-LDC Sub-LDC Wide Band / PLCC Commn RTU RTU RTU

76 CISCO ROUTER & NETWORKING DATABASE ADMINISTATION
ULDC TRAINING SL NAME OF THE TRAINING FROM TO Participants Man days 1 CISCO ROUTER & NETWORKING 17 102 2 XA-21 USER LEVEL 10 60 3 RTNA WORKSHOP 14 42 4 AIX OPERATING SYSTEM 15 90 5 6 30 DATABASE ADMINISTATION 19 228 Total Man days = 552

77 Complexities in Monitoring & Control Annual Inter-Regional
Southern Region Grid Complexities in Monitoring & Control Integrated Opn of Ten Power Utilities Annual Inter-Regional Energy Transfer ≈10,000MU Generators –Hydro, Thermal,Gas/IPP 422 nos. Transmission Network 400/220kV ≈ Ckm Installed Capacity ≈31870 MW 40,000 POINTS Active Power, Reactive Power, Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position, Isolator Position etc. Transformation Capacity ≈ 45000 MVA Transformers (220kV and above) 480 nos. Dynamic Grid Conditions

78 Bouquet of Benefits Integrated System Operation with improved system visibility Enhanced Operation Efficiency Quality Power - Frequency and Voltage Control Merit Order and Economic Load Dispatch Fewer System Collapses & Faster Restoration First Step towards Sub-station Automation Adaptability to the ever growing Power System

79 TALCHER KOLAR HVDC LINE LENGTH:1400 KMS
HVDC STATION KOLAR (KARNATAKA) TALCHER ORISSA) TALCHER KOLAR HVDC LINE LENGTH:1400 KMS

80 TALCHER KOLAR LINK ONE OF THE LONGEST HVDC LINES IN THE WORLD
DESIGNED TO EVACUATE 2000 MW COMMISSIONED IN ADVANCE TO UTILISE NON-PEAK SURPLUS POWER OF EASTERN REGION COMMISSIONED 9 MONTHS AHEAD OF SCHEDULE THE PROJECT HAS USED APPROXIMATELY 90,000 TONNES OF STEEL AND 16,000 KM OF CABLES

81 TALCHER KOLAR HVDC LINK BENEFITS TO SOUTHERN REGION
SUBSTANTIAL IMPROVEMENT IN THE VOLTAGE PROFILE FOR THE REGION. TRUNK LINE LOADINGS EASED – INCREASED TRANSFER MARGIN. MAX IMPORT FROM ER 1600 MW MORE DEMAND IS BEING MET. DEPLETED HYDRO RESERVES IS BEING CONSERVED. AVERAGE COST OF POWER IS BROUGHT DOWN SURPLUS IN ER EFFECTIVELY UTILISED PERFORMANCE IMPROVEMENT OF POWER STATIONS IN EASTERN REGION INCREASED STOA TRANSACTIONS ABOUT MU IMPORTED ON THIS LINK TILL DATE!!

82 TALCHER-KOLAR IMPORT OF 13447MUs FROM ER THROUGH TALCHER-KOLAR UPTO NOV-04 YEAR ---> 2002 2003 2004 MONTHS TOTAL ENERGY (IN MU) MAX FLOW (IN MW) JAN --- 311 850 805 1528 FEB 273 1010 701 1508 MAR 491 1316 837 1600 APR 473 1183 923 1500 MAY 172 1026 652 1385 JUN 277 994 688 1416 JUL 319 1075 759 1490 AUG 346 1088 628 1341 SEP 6 200 512 1533 742 1552 OCT 58 500 508 1458  829 1550 NOV 77 470 1048  719 DEC 241 750  630 1383  TOTAL 382 4782 8283 AVERAGE 96 399 753 MAX FLOW

83 RESERVOIR LEVEL - COMPARISON
LEVEL IN MTS LEVEL 30-Nov-03 30-Nov-04 JALAPUT 837.48 836.17 LINGANMAKKI 545.35 548.61 SUPA 534.73 545.48 IDUKKI 715.65 772.96 KAKKI 969.19 972.43 NILGIRIS TOTAL ENERGY 30-Nov-03 30-Nov-04 RISE IN MU % RISE 514 440 74 14 2148 2708 560 26 1062 1787 725 68 947 1413 466 49 528 612 84 16 559 1463 904 162 5758 8423 2665 46 Only 7500MUs Reserve till next monsoon (6 Months) 40 MUs/day could be generated as against about 70 MUs/day at present.

84 GRID OPERATION: A TIGHT ROPE WALK
POWER SWINGS INSTABILITY INCREASED LOSSES BLACK-OUT IN-ECONOMIC OPERATION VOLTAGE COLLAPSE

85 UI IN SR (FROM 01/01/03 TO 10/10/04) TOTAL UI TURNOVER : MU TOTAL UI AMOUNT DISBURSED: CR AVG WEEKLY TRANSACTION:- 60 MU AVG WEEKLY UI AMOUNT DISBURSED: CR

86 INTER-REGIONAL EXCHANGES WR A/C DETAILS UPTO 93 WKS TILL 10/10/04
NET ENERGY TRANSACTION IS 146 MU (IMPORT BY SR). AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 41.83Crs AMOUNT TO BE ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 27.71Crs AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 34.73Crs AMOUNT ALREADY DISBURSED TO SR CONSTITUENTS = 33.39Crs

87 FREE GOVERNOR MODE OF OPERATION ON 20-DEC-04
SHARAVATHI - 1

88 FREE GOVERNOR MODE OF OPERATION ON 20-DEC-04
SHARAVATHI - 4

89 FREE GOVERNOR MODE OF OPERATION ON 20-DEC-04
NTPC - 4