E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 1 Status of Cryomodule-A for S1-Global at KEK Eiji Kako (KEK, Japan)
2
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 2 He Jacket Welding of 4 KEK cavities at MHI-Kobe 2010, Jan. 29 MHI-05 MHI-07 MHI-06 MHI-09
3
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 3 Delivery of 4 MHI Cavities at KEK Four MHI cavities (MHI-05, 06, 07, 09) arrived at KEK in 16th, February. MHI-06 MHI-05 MHI-07 MHI-09
4
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 4 Preparation of Cavity Support Posts Class-1000 Clean Room (19th, February)
5
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 5 Cleaning of Cavities with Car Washer Entrance of Clean Room (23rd, February)
6
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 6 Installation on Support Posts Class-1000 Clean Room (23rd, February) MHI-07 Cavity
7
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 7 Preparation of Cavity String Assembly MHI-05 MHI-06 MHI-07 MHI-09 23rd, February 2010’ Class-1000 Clean Room
8
E. KAKO (KEK) 2010' Feb. 23 Webex meeting S1-G Global Design Effort 8 Schedule: String Assembly of KEK Cavities Feb. 22 ~ ; class-1000 clean room Cleaning and setting of 4 KEK cavities Cleaning and disassembly of 4 input couplers Preparation of Gate-valve, Taper & 3 Bellows Mar. 01 ~ ; class-10 clean room String assembly of 4 KEK cavities Leak check, Ar gas slow leak up to 1 atm Mar. 08 ~ ; outside of clean room Slide-Jack tuner assembly, Align. of 4 cavities Mar. 15 ~ ; outside of clean room Tuner drive check, RF meas. (fo, Qext, stroke)