The European Organisation for the Safety of Air Navigation Objective AOP05
2
September 2013 2 Objective AOP05 Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2012 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts
3
September 2013 3 Comprehensive Explanation Implement Airport Collaborative Decision Making (CDM) This objective aims at implementing A-CDM to enhance the operational efficiency of airports and improve their integration into the Air Traffic Management Network (ATMN) while maintaining or improving the safety levels; The applicability area is presented in Table 8 of Part IV Annex B of the ESSIP 2012 document; Initial operational capability - 01/2004, Full operational capability - 01/2016
4
September 2013 4 Link to European ATM Master Plan [AO-0501]-Improved Operations in Adverse Conditions through Airport Collaborative Decision Making; [AO-0601]-Improved Turn-Round Process through Collaborative Decision Making; [AO-0602]-Collaborative Pre-departure Sequencing; [AO-0603]-Improved De-icing Operation through Collaborative Decision Making; [DCB-0301]-Improved Consistency between Airport Slots, Flight Plans and ATFM Slots; [DCB-0302]-Collaborative Management of Flight Updates;
5
September 2013 5 Most important SLoA(s) APO01/ASP01/USE01- Define and agree performance objectives and KPIs at local level specific to airport operations in accordance with A- CDM Manual guidelines; APO02/ASP02/USE02 - Define and implement local airport operations procedures for information sharing through Letters of Agreement (LoAS) and/or Memorandum of Understanding (MoU) in accordance with A-CDM Manual guidelines; APO03/ASP03/USE03 - Define and implement local procedures for turnaround processes in accordance with CDM manual guidelines (baseline CDM); APO05 Define and implement the exchange of messages, Flight Update Message (FUM) and Departure Planning Information (DPI) between CFMU and the airport in accordance with A-CDM Manual guidelines; APO06/USE05 Define and implement procedures for CDM in adverse conditions including de-icing according to airport CDM Manual guidelines.
6
September 2013 6 Most important Finalisation Criteria APO01/ASP01/USE01 - Agreed list of performance objectives and KPIs; APO02/ASP02/USE02 - Agreed LoA or MoU signed between the Airport CDM Partners; APO03/ASP03/USE03 - Agreed local procedures for turnaround processes; APO05 - FUM and DPI messages exchanged with CFMU; APO06/USE05 - CDM procedures established in adverse weather conditions;
7
September 2013 7 Supporting Material EUROCAE-ED-141-Minimum Technical Specifications for airport Collaborative Decision Making (Airport-CDM) Systems, dated October 2008; EUROCAE-ED-145-Airport-CDM Interface Specification, dated October 2008; EUROCAE-ED-146-Guidelines for Test and Validation Related to Airport CDM Interoperability, dated October 2008 Url: http://boutique.eurocae.net/catalog/index.phphttp://boutique.eurocae.net/catalog/index.php
8
September 2013 8 Supporting Material EUROCONTROL-Airport CDM Functional Requirements Document, Edition 4.0, dated May 2009; EUROCONTROL-Airport CDM Implementation Manual, Edition 4,0, Dated 01.04.2012 Url : http://www.euro- cdm.org/library_eurocontrol_implementation.phphttp://www.euro- cdm.org/library_eurocontrol_implementation.php ETSI-EN303 212, V1.1.1 - Airport Collaborative Decision Making (A-CDM); Community Specification for application under the Single European Sky Interoperability Regulation EC 552/2004, dated 01.06.2010, OJ 2010/C 168/04 Url : http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp http://webapp.etsi.org/workprogram/SimpleSearch/QueryForm.asp
9
September 2013 9 ESSIP Report 2012
10
September 2013 10 Objective Coordinator’s Analysis, recommendations, tips & tricks Information/data are missing for some of airports within the applicability area; More elaborate explanation of chosen progress assessment is required
11
September 2013 11 Links and contacts Objective Coordinator: Predrag Vranjkovic, +32 2 729 3257 predrag.vranjkovic@eurocontrol.int@eurocontrol.int DNM Objective Expert: Paul Adamson, +32 2 729 5183 paul.adamson@eurocontrol.int