Download presentation
Presentation is loading. Please wait.
Published byClarissa McDonald Modified over 9 years ago
1
What have we ‘Bin’ up to at the ANU John Sullivan Recycling & Sustainable Systems Manager Facilities and Services / Energy and Conservation Office
2
Where we are Located in the suburb of Acton, within the ACT Foot print of 150 hectares 15500 staff and students Spends in excess of $250,000 pa for waste management
3
Environmental Management Plan EMP launched in 1998 8 Key target areas Waste KPI – 70% reduction of waste to landfill (based on 2002 figures ) by 2008
4
Key Points Introduction of the recycling Infrastructure comprised of three main areas: Building Waste Public Stations Other recycling activities
5
Development of a Recycling Infrastructure Investigation of existing services and systems. Discussions with end users to determine their acceptance of the ideology
6
Development of a recycling Infrastructure Determine the range of services required to suit the users needs Development of standardised and flexible signage
7
Development of a Recycling Infrastructure Maximise the potential of existing systems by use of effective signage
8
Development of the public stations Aim – enable recycling within the public/ landscape areas on campus
9
Development of public stations Aim – simple construction Standard components
10
Introduction of the recycling Infrastructure Replacement of existing field bins Raise the level of public awareness of ANUgreen
11
Event Waste Management 2 or 4 Bin Station Temporary units
12
Introduction of the recycling infrastructure Ability to blend with existing architecture
13
Service providers A requirement to provide a level of personal service beyond that normally offered by the larger organisations.
14
Service Providers Flexibility of independent service providers to meet the needs of the client.
15
Development of Waste Audit Methodology Audit required to evaluate the success of the public stations To gain a better understanding of the waste stream composition
16
Development of links with external groups Interhall working group Approximately 2500 students on campus
17
Development of links with external groups Green Corps team undertaking audit
18
Development of links with external groups Environmental accounting Class 17 groups Carry out audits over a 4 week period
19
Waste audit sheet
20
Waste audit results Actual recycling bins performed well Waste bins still contained a large percentage recyclable material Provided good feedback for areas on performance
21
IT Recycling Amnesty period for 2003 to encourage the clearing of redundant IT equipment ANU turnover of 1500 machines per anum Over 1800 machines collected
22
Fluorescent tube Recycling Each 4’ tube can contain around 30 milligrams of mercury, which in turn has the capacity to pollute 30,000 litres of water 600 kilograms of tubes recycled in 2003
23
Steel Recycling 37.7 tonnes collected in 2003 Cost saving of around $4000 Each tonne of steel recycled saves - up to 75% of the energy required to make steel from virgin materials
24
Furniture Recycling Over 450 items recycled in 2003 Opportunity for ANU to interact with Charity groups
25
Communication “Back of the loo” program Information to a captive audience
26
Conclusion If you cant measure it you can’t manage it. Education of staff is an essential component Systems must be flexible to allow for change