Download presentation
Presentation is loading. Please wait.
Published byKerrie Perkins Modified over 9 years ago
1
HALL HIGH SCHOOL NEW SCHOOL PROJECT MARCH 28
2
Main entrance & cafeteria windows Main entrance
3
Future Home of the “Hall Pride” Courtyard (You can buy a paver brick with your name inscribed)
4
View from the main lobby looking north- View looking south from the main lobby
5
Auditorium- stage and sound/lighting booth
6
The “Red Gym” (main gym)- looking northwest and looking east at the upper gym outer wall
7
The “White Gym” auxiliary gym (last goal being installed today)
8
1914 brick removed from current school and installed in the new cafeteria
9
Millwork installed in classrooms
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.