Download presentation
Presentation is loading. Please wait.
Published byJoella Lambert Modified over 9 years ago
1
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 1 802.15 53rd Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks March 16-21, 2007 Caribe Royale Convention Center 8101 World Center Dr Orlando, FL, USA
2
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 2 802.15 Organization Chart To add your name to the WG/SG/TG reflectors please go to www.ieee802.org/15www.ieee802.org/15
3
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 3 Objectives of the Orlando Session March 16-21, 2008 TASK GROUP 3c –mmWave PHY for 15.3 1.Complete Initial Drafting Effort 2.Seek approval for WG Letter Ballot 3.Update Project Timeline TASK GROUP 4c Alternate PHY layer: 1.CWPAN Status/Update and Next Steps 2.Finalize Drafting Schedule 3.Next Steps & Timeline
4
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 4 TASK GROUP 4d Alternate PHY layer: 1.Review Final Proposal Submissions 2.Establish Drafting Group 3.Update Project Timeline TASK GROUP-4e MAC Enhancements 1.Officer Elections 2.Refine Project Timeline/Work Activity Objectives of the Orlando Session March 16-21, 2008
5
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 5 TASK GROUP 5 –Mesh Networking: 1.Comment Resolution -Working Group Letter Ballot 2.Technical Presentation and Discussion 3.PAR extension decision 4.Discussion of project plan-start of Sponsor Ballot TASK GROUP 6-Body Area Networks 1.Finalize Application Matrix 2.Work on Channel Model and TR documents 3.Finalize operating procedures 4.Update Project Timeline as needed Objectives of the Orlando Session March 16-21, 2008
6
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 6 STUDY GROUP-RFID 1.Develop Objectives 2.Identify groups that should be contacted to participate 3.Review Liaison Contacts Made 4.Draft Preliminary 5C and PAR Scope and Purpose NEW PROJECTS SUBCOMMITTEE 1.Report on sub-group progress 2.New presentations Objectives of the Orlando Session March 16-21, 2008
7
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 7 INTEREST GROUP-VISIBLE LIGHT COMMUNICATIONS 1.Develop Objectives 2.Conduct Tutorial for 802 Community 3.Review Liaison Contacts Made 4.Seek Approval to form a Study Group INTEREST GROUP- TERRAHERTZ COMMUNICATONS 1.Prepare Call for Contributions 2.Review Current Contributions Objectives of the Orlando Session March 16-21, 2008
8
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 8
9
doc.: IEEE 802.15-08-0127-00 Submission March 2008 Robert F. HeileSlide 9 Upcoming Sessions May 11-16, 2008, Hyatt, Jacksonville, FL, Interim July 13-18, 2008, Hyatt Regency Denver at the Colorado Convention Center Denver, Colorado USA, 802 Plenary Meeting. Sept 7-12, 2008, Hilton Waikoloa Villiage, Big Island, HI, USA Interim November 9-14, 2008, Hyatt Regency Dallas, TX, USA, 802 Plenary Meeting. January 18-23, 2009, Location TBD Interim March 8-13, 2009, Hyatt Regency & Fairmont Vancouver, BC, Canada, 802 Plenary Meeting.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.