On S1Global Writeup S1G Writeup Meeting 20110713 Nobu Toge 1.

Similar presentations


Presentation on theme: "On S1Global Writeup S1G Writeup Meeting 20110713 Nobu Toge 1."— Presentation transcript:

1 On S1Global Writeup S1G Writeup Meeting 20110713 Nobu Toge 1

2 History 2011/1 : Internal discussion at KEK.. Need for a write-up, need for a workshop (assessment / postmortem of S1G) 2011/1/11: @KEK LC Regular Mtg – writeup outline (Toge) 2011/2/28: @TTC-Milano – discussion of members from INFN/Milano, DESY, FNAL and KEK – Agreed to assign contact persons (progress halted due to 311 EQ) 2011/6/20: Proposal email (Toge) to re-activate the effort 2

3 On S1Global Write-up Motivation S1Global exp concludes in Feb. 2011. Usefulness / worth is noted of “a project-level write-up” on the overall results, accomplishments and remaining research subjects. That is, besides individual publications, papers and talks. Outline (prelim. Need inputs!) 1.Intro: Motivations, purposes 2.Overview: Facility + equipment, study topics, job sharing 3.HW details; Cavities, couplers, tuners 4.HW details: CM 5.HW details: Cryogenics 6.HW details: RF sources, WG, LLRF controls 7.Results: single-cavity operations 8.Results: cavity-string operations 9.Results: CM operation 10.Results: DRFS operation 11.Summary: Accomplishments, Remaining topics A. Project history chart References Example: STF Phase-1 report from KEK (Japanese): http://ilc.kek.jp/STF/Phase1Report/KEK-2009- 3compressed.pdf (16MB) http://ilc.kek.jp/STF/Phase1Report/KEK-2009- 3compressed.pdf BTW: Do we want a NIM paper or a lab report? How to proceed Prep at KEK (this slide) Approach collab institutes and agree on Need + value of a write-up. Contact persons. Scope, scale, TOC of the write-up. Task sharing Do the actual writing + editing. Schedule: How about something electro-sharable in Fall, 2011?  Discussion at, for instance TTC in Beijing  Follow-up work  Publication in early 2012 (?) N.Toge Rev.20110620 Material Meeting presentations compiled at http://ilc.kek.jp/STF/S1Global/PDF and http://ilc.kek.jp/STF/S1Global/PPT http://ilc.kek.jp/STF/S1Global/PDF http://ilc.kek.jp/STF/S1Global/PPT 3

4 Status 2011/7 Editorial Group / Contact persons – Rocco Paparella (INFN) – Jim Kerby (FNAL) – Wolf-Dietrich Moeller (DESY) – Nobu Toge (KEK) – Chief Editor – Akira Yamamoto (GDE Contact) Materials from past webex meetings – “S1-Global Experiment, Materials Presented at …” under http://ilc.kek.jp/STF/ http://ilc.kek.jp/STF/ 4

5 Basic Policies (draft) Report #: KEK report # and GDE report #. Most likely FNAL, INFN #s, too. Akira is the GDE contact during this authoring process. This is a technical report on what we did and learned at S1G. – Not a report to assess our future prospects for detailed engineering of ILC. – If someone wants to analyze such issues, this report gives technical contents that can be provided from the standpoint of S1G experience. On technical statements and conclusions: – All who participated in the S1G can / should participate in discussion on equal footing. – Actual editorial process would be managed by the editorial G. Toge is the chief editor (  someone to complain to if something is wrong). 5

6 Schedule (draft) Basically – something electro-sharable in Fall, 2011?  – Discussion at, for instance TTC in Beijing  – Follow-up work  – Publication in early 2012 (?) More specifically – July 2011 - Form the editorial group. Draft the rough outline of the report. Assign writing duties – Aug. 2011 - Develop the detailed outline and draft conclusions. Some interactions – Sep. 2011 - Writing, prepare figures, illustrations etc – Oct. 2011 - Editor-Author interactions – Nov. 2011 - First round of editorial assembly  Draft Document – Dec. 2011 - Discussion, for instance, at the TTC meeting in Beijing Follow-up – Jan. 2011 - Finalization + publication, mostly electronically, but also possibly in paper. … if we can agree ; can you? 6

7 Relation with TTC in Beijing (Dec. 2011) @TTC Session Report S1G results, if they are considered fit. Q&A as found adequate In Beijing but separated from TTC Plans on follow-up activities after Dec 2011. Final editorial process of the S1G writeup. Important A.Yamamoto (GDE PM) has talked to O.Napoly (TTC Chair) in May – June, and they have agreed concerning the outline, in principle. Need to organize S1G presentation and the time slots needed Estimate  TTC EC The sooner the better 7

8 Open issues Assignment of outlining job  this we need to quickly resolve Is this going to be lab reports or be a NIM paper, for instance? Any others? 8 1.Intro: Motivations, purposes 2.Overview: Facility + equipment, study topics, job sharing 3.HW details; Cavities, couplers, tuners 4.HW details: CM 5.HW details: Cryogenics 6.HW details: RF sources, WG, LLRF controls 7.Results: single-cavity operations 8.Results: cavity-string operations 9.Results: CM operation 10.Results: DRFS operation 11.Summary: Accomplishments, Remaining topics A. Project history chart References