Download presentation
Presentation is loading. Please wait.
Published byJodie Sims Modified over 9 years ago
1
4 Construction Site today Construction Site – current Google Maps View 1Short Status of FAIR for NuPECC /KP
2
FAIR @ Darmstadt Short Status of FAIR for NuPECC /KP Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Dense Bulk Plasmas (Ion-beam bunch compression & petawatt-laser) Materials Science & Radiation Biology (Ion & antiproton beams) Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics UNILAC SIS18 SIS100/300p-Linac HESR CR & RESR NESR Cryring Rare-Isotope Production Target Anti-Proton Production Target 100 m QCD-Phase Diagram (HI beams 2 to 45 GeV/u) QCD-Phase Diagram (HI beams 2 to 45 GeV/u) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) Hadron Physics (Stored and cooled 14 GeV/c anti-protons) Nuclear Structure & Astrophysics (Rare-isotope beams) Nuclear Structure & Astrophysics (Rare-isotope beams) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Module 3: High-energy p (p-linac, p, CR,HESR) Module 2: Super-FRS Module 1: Experimental areas Module 0: SIS100 and connection to existing accelerators 2 Construction in Modules
3
PANDA NuSTAR Super- FRS FAIR Experiments Short Status of FAIR for NuPECC /KP APPA 3 in all 4 scientific core activities CBM
4
Planning Activities 4Short Status of FAIR for NuPECC /KP
5
Civil Engineering New Beamline: ∑ 3.2 km thereof Syncrotron: 1.1 km Existing: SIS 18 600.000 cbm > 1 Mio tons of concrete 35.000 tons of steel 5Short Status of FAIR for NuPECC /KP
6
status of piling works 6 piling to date: well ahead of schedule goal: finished before Q III/2014 Klaus Peters - Exotics at PANDA6Short Status of FAIR for NuPECC /KP
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.