Presentation is loading. Please wait.

Presentation is loading. Please wait.

Using Demetra+ at SURS Manca Golmajer, Andrejka Smukavec 20 June 2013.

Similar presentations


Presentation on theme: "Using Demetra+ at SURS Manca Golmajer, Andrejka Smukavec 20 June 2013."— Presentation transcript:

1 Using Demetra+ at SURS Manca Golmajer, Andrejka Smukavec 20 June 2013

2 Organization of SA Time series methodologists –Modelling (model selection and modification) –Training (study, preparation of literature, courses) Contact: zascas.surs@gov.sizascas.surs@gov.si Survey managers –Preparation of original data –Automatic seasonal adjustment –Publishing

3 Seasonal adjustment software and method Software: Demetra 2.04: until 2013 Demetra+ 1.0.4: between 2013 and 2014/2015 JDemetra+: from 2014/2015 on Method: TRAMO/SEATS

4 Introduction of Demetra+ Gradual introduction of Demetra+ during 2013: New time series: Demetra+ is used Old time series: introduction of Demetra+ is joined with annual review FIELDLAST PERIODPUBLICATION Industry, construction, trade, services 1/2013February, March 2013 Labour marketQ1/2013June, July 2013 Business tendency10/2013, Q4/2013October 2013 National accountsQ3/2013November 2013

5 Associated activities Literature: –Time series manual (for survey managers) –Time series glossary –Seasonal adjustment of time series (methodological explanations) –Commenting of seasonal adjustment of time series –Demetra+ manual (for time series methodologists) Course for survey managers Presentation for the Bank of Slovenia and the Institute of Macroeconomic Analysis and Development

6 Input and output file Input file: –Excel One sheet One type (monthly or quarterly time series) Dates: first day of the period Output file: –Excel – ByComponent Used by most survey managers Dates: first day of the period –Csv – VTable Dates: last day of the period

7 Refreshing Transformation, calendar effects, regression effects (pre-specified outliers) and the ARIMA model are fixed, only automatic outlier detection might be enabled for the last few periods. The refreshing option: Partial concurrent adjustment – All outliers (+params) –Options Concurrent adjustment and Partial concurrent adjustment – Arima and outliers (+params) do the same in our case –Option Partial concurrent adjustment – Last outliers (+params) enables automatic outlier detection for the whole last year

8 Checking the results Seasonal adjustment of a time series is successful if: 1.summary is Good 2.all the other diagnostics (except for the number of outliers) are Good or Uncertain 3.automatic outlier detection is disabled If seasonal adjustment of any time series is unsuccessful, the survey manager must send the multi-processing to the time series methodologist to check and maybe change the model (check the Bad diagnostics, include an outlier, etc.).

9 Some positive things about Demetra+ It is very user-friendly: –Well organized –Colours are used –Our survey managers like the Excel output It has a lot of possibilities, tools, tests, etc. It gives the user a lot of information and better understanding of the seasonal adjustment process. It is much faster to select a model (transformation, calendar effects, outliers, ARIMA model) with Demetra+ than with Demetra.

10 Some negative things about Demetra+ We do not like the chart scale.

11 It is difficult to compare different models for the same time series. The maximum values for the coefficients of the ARIMA model are (3,2,3)(1,1,1). In Demetra we also used (0,1,1)(0,1,2). In Demetra+ we use (0,1,1)(1,1,1) instead.

12 Some problems with Demetra+ Strange values for time series components

13 Methodological improvements We can send our questions to ESTAT- Methodology@ec.europa.eu.ESTAT- Methodology@ec.europa.eu We started using trading days effect (6 or 7 regressors). Before we used only working days effect (1 or 2 regressors).


Download ppt "Using Demetra+ at SURS Manca Golmajer, Andrejka Smukavec 20 June 2013."

Similar presentations


Ads by Google