Britt Kern Mechanical Option Advisor: Dr. Treado Hunter’s Point South School Queens, New York.

Similar presentations


Presentation on theme: "Britt Kern Mechanical Option Advisor: Dr. Treado Hunter’s Point South School Queens, New York."— Presentation transcript:

1 Britt Kern Mechanical Option Advisor: Dr. Treado Hunter’s Point South School Queens, New York

2 Britt Kern Mechanical Option  Introduction i.Building Summary ii.Site Plan iii.Existing Mechanical  Proposed Redesign  Mechanical Depth  Breadth – Electrical  Conclusion Size:153,769 sf Occupancy:IM/HS Schoolhouse Levels:5 Stories/No Cellar/Penthouse Cost:$61,098,000 Construction Dates :Jan 10, 2011 to Oct 7, 2013 Project Team Architect:FXFOWLE Architects StructuralYsreal A. Seinuk MEP: Kallen & Lemelson CM:Skanska Hunter’s Point South School

3 Britt Kern Mechanical Option  Introduction i.Building Summary ii.Site Plan iii.Existing Mechanical  Proposed Redesign  Mechanical Depth  Breadth – Electrical  Conclusion Hunter’s Point South School N Part of the Hunter’s Point South Project  Redevelopment of Waterfront  Vibrant  Sustainable  Middle-Income  Urban Community

4 Britt Kern Mechanical Option  Introduction i.Building Summary ii.Site Plan iii.Existing Mechanical  Proposed Redesign  Mechanical Depth  Breadth – Electrical  Conclusion AHU’s 1, 2, and 3 = VAV AHU’s 4, 5, and 6 = CAV 4 Condensing Boilers Fin Tube Radiators (2) 276 ton chillers Problems? Minimum Ventilation No Energy Recovery AHU 2 AHU 1 AHU 3 AHU 4 AHU 6 AHU 5 Mechanical Penthouse ACH-1 ACH-2 Hunter’s Point South School

5 Britt Kern Mechanical Option  Introduction  Proposed Redesign i.Objectives  Mechanical Depth  Breadth – Electrical  Conclusion Goals Ventilation Always Met Increase Sustainability Better Room Comfort Control Airside Replace AHU’s 1-3 with DOAS Total Energy Recovery Wheel Fan-Powered Induction Units (FPIU’s) Breadths Photovoltaic Solar Panel Array Structural Roof Analysis Hunter’s Point South School Waterside New Chillers Secondary Chilled Water Loop

6 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Ventilation Air Based On:  NYC Mechanical Code  30% Above ASHRAE Std. 62.1  Latent Load Reduction in 18% OA and 55% SA Exhaust Rates and ESP of Fans Hunter’s Point South School OA SA

7 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion 2 DOAS Specified by Manufacturer Total Energy Recovery Wheels All Preheating of OA Summer Design Winter Design Hunter’s Point South School 72°F, 30% RH 12.8°F, -5.4 DP

8 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Find CHW Supply Temp Size Coils for Heating and Cooling Optional MERV 8 filter – 1 LEED Point Supply CHW 58°F 75°F, 55% RH Hunter’s Point South School

9 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Current CHW Loop Re-Used: a.(2) 225 ton chillers b.LWT 44°F Higher CHW Temp for FPIU’s Secondary CHW Loop Created  33.5 ton chiller  LWT 58°F Current Chilled Water Loop Hunter’s Point South School Secondary Chilled Water Loop

10 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion ρ = constant Hunter’s Point South School

11 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Compare Old and New Systems Validate New System 3 Models:  VAV 100% Flow  VAV 30% Flow  FPIU Criteria:  No Drafts (<40 fpm)  Uniform Temperature (Setpoint 72°F)  Minimal Temperature Stratification Supply Diffuser Exhaust Outlet Hunter’s Point South School Student

12 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Results:  VAV 100% Flow -Some Drafts -High Room Temp  VAV 30% Flow -Lots of Drafts -High Room Temp 22 fpm 55 fpm 72°F 76°F 53 fpm 12 fpm 42 fpm 77°F 74.5°F Hunter’s Point South School

13 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Results:  FPIU No Drafts Steady Room Temp (72-73°F) Conclusions:  VAV is Problematic  FPIU = Good Air Distribution/Thermal Comfort 22 fpm 60 fpm 73°F72°F Hunter’s Point South School

14 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Reduction in:  Electricity = 7% (5% due to solar)  Natural Gas = 41%  Emissions = 16% CO 2e Electricity Usage by Month Natural Gas Usage by Month Hunter’s Point South School

15 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth i.DOAS/Wheel ii.FPIU iii.Chillers/Loops iv.CFD (MAE) v.Results  Breadth – Electrical  Conclusion Costs New Rooftop Units  Savings = $622,174 Costs Associated with FPIU’s  Savings = $651,137 Initial Cost Savings = $1,273,311 Enough Savings to Finance Solar Array Hunter’s Point South School

16 Britt Kern Hunter’s Point South SchoolMechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical i.Roof Layout ii.Schematic iii.Payback Analysis  Conclusion Inverter Combiner Boxes 68.99 kW

17 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical i.Roof Layout ii.Schematic iii.Payback Analysis  Conclusion Inverter Combiner Boxes < 9’ setback Hunter’s Point South School

18 Britt Kern Mechanical OptionHunter’s Point South School 100 feet away Difference in Height = 153 ft - 73 ft = 80 ft SohCahToa: Tan(x degrees) = 80 / 100 x = 38.7 degrees From 8:25 am on no shading. 100 ft 80 ft Angle  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical i.Roof Layout ii.Schematic iii.Payback Analysis  Conclusion N Summer Solstice

19 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical i.Roof Layout ii.Schematic iii.Payback Analysis  Conclusion Combiner Box DC Disconnect Inverter (75 kW) AC Disconnect Switchboard 2 GFI Fuse Combiner Box X 10 strings X 8 strings Hunter’s Point South School

20 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical i.Roof Layout ii.Schematic iii.Payback Analysis  Conclusion Initial Costs $296,666  After Incentives = $60,075 $14,987 Savings/year 188% Life Cycle Payback  Profit = $260,745 Hunter’s Point South School

21 Structural: Girders/Non-Composite Deck 25 Year LCC Analysis Performed NPV Savings = $2,018,185 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical  Conclusion i.LCC Analysis ii.Acknowledgments iii.Questions

22 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical  Conclusion i.LCC Analysis ii.Acknowledgments iii.Questions Contacts:  Patrick Murphy Vanderweil Engineers  Chris Bratz Meta Engineers  Carter Tse Kallen & Lemelson  Sharvil Patel Skanska Manufacturers:  Tim Dorman (DOAS/Wheels)  David Cunningham (Chillers)  Justin Anderson (FPIU) Advisor: Dr. Stephen Treado AE Professors/Faculty and Fellow Students Family and Friends Hunter’s Point South School

23 Britt Kern Mechanical Option  Introduction  Proposed Redesign  Mechanical Depth  Breadth – Electrical  Conclusion i.LCC Analysis ii.Acknowledgments iii.Questions Questions? Hunter’s Point South School

24 Britt Kern Mechanical Option

25 Britt Kern Mechanical OptionHunter’s Point South School

26 Britt Kern Mechanical OptionHunter’s Point South School

27 Britt Kern Mechanical OptionHunter’s Point South School

28 Britt Kern Mechanical OptionHunter’s Point South School

29 Britt Kern Mechanical OptionHunter’s Point South School

30 Britt Kern Mechanical OptionHunter’s Point South School N No Shadows

31 Britt Kern Mechanical OptionHunter’s Point South School N No Shadows

32 Britt Kern Mechanical OptionHunter’s Point South School 100 feet away Difference in Height = 153 ft - 73 ft = 80 ft SohCahToa: Tan(x degrees) = 80 / 100 x = 38.7 degrees From 8:25 am on no shading. 9 am, Summer Solstice 100 ft 80 ft angle

33 Britt Kern Mechanical OptionHunter’s Point South School

34 Britt Kern Mechanical OptionHunter’s Point South School Under Create Systems  Option Tab  Advanced Options

35 Britt Kern Mechanical OptionHunter’s Point South School