Greenhouse Construction Bunker Hill Agriculture Department 2012-13
2
Size 30 feet by 60 feet and 16 feet at the apex Jaderloon House Number Flats the house can contain is 1000 flats and 380 hanging baskets
3
Cost of Construction Materials Greenhouse $26,265.13 Architect $ 3,000.00 Footing and Walkways $ 1,156.81 Benches $ 2,143.81 Fans $ 990.46 Electrical $ 660.00 Irrigation $ 260.79 Miscellaneous $ 202.01 Total $34,679.00
4
Man Hours in Construction All Agriculture classes ( 81 students) participated in the construction of the new greenhouse. Total number of student hours involved in the greenhouse construction was: 1625 man hours. Total Cost of Man hours @12.00 per hour was $19,500.00
5
Total Cost of Greenhouse Materials $34,679.00 Labor $19,500.00 Total Opportunity Cost $54,159.00
6
Donors and Grants Catawba County Farm Bureau $10,000 NC FFA Improvement Grant $ 5,000 Tobacco Trust Fund Bunker Hill FFA $ 2,000 Catawba County CTE Dept. $17,674 Total $34,679
10
Thank you! from all the agriculture students and staff of BHHS Without your contribution this project would not have been possible!